Block Making Machine in Algeria: Sizing for Load-Bearing Blocks
10 October 2026 · 6 min read
Quick answer
In Algeria the machine is sized by the tallest building in the order book, because on the top storey a 200 mm load bearing block carries four floors of wall and slab above it. That block needs more compaction energy per cycle at 31.5 MPa, not a faster cycle. Multi-storey work starts at a heavier frame; single-storey housing and garden walls stay on a lighter machine.
A block making machine in Algeria is bought against one number, the compressive strength of a 200 mm load-bearing block on the top floor of a five-storey building. Multi-storey residential construction here is load-bearing masonry, so the wall carries the slab and the block carries the wall. That single fact moves the machine specification, the mix design and the pallet fleet at the same time. A 95 kN tamper and a 150 kN tamper can both press a 200 mm mould, but only one of them keeps a top-floor block inside its strength class after curing. The sections below work through the sizing logic, the pallet arithmetic and the curing schedule that a single-storey plant never has to solve.
1. Why storey count raises the excitation force on a 200 mm block
A 200 mm hollow block that passes on a single-storey house can fail on the fifth floor of a load-bearing building, because the same block now carries four floors of wall and slab above it. The answer is not a different mould but more compaction energy per cycle, delivered through a stiffer frame. Our QST8-15 runs 95 kN of excitation force at 31.5 MPa of hydraulic pressure and holds 90,000 standard bricks per 8 hours. The QST1200 lifts excitation force to 150 kN at the same 31.5 MPa and reaches 120,960 bricks per 8 hours. The QST1800 goes to 280 kN and 220,000 bricks per 8 hours. The pressure ceiling is identical on all three, so what a builder feels on site is how fast and how completely the mix densifies, not the gauge reading.
2. Mix design for a block that carries load, not just a partition
A load-bearing block is a semi-dry mix that is pressed and vibrated, not poured. The water to cement ratio stays low enough that the block leaves the mould with its edges intact, and the press at 31.5 MPa finishes the densification that vibration starts. Vibration frequency on our QST1200 runs 3,800 to 4,500 rpm, which is what moves a stiff mix through a 200 mm mould height inside a 15 to 25 second cycle. Add water so the mix flows and the 28 day strength drops. Cut vibration time to gain output and the corners go soft. For a block that will carry slabs, set the mix by weight, test cubes from the same batch, and keep the cycle at its slow end until the first ten pieces crush where you expect them to.
3. Pallet fleet sizing: the investment nobody quotes
Pallets are the one item on the quotation nobody sizes, and a plant that runs out of empty pallets stops the machine as surely as a power cut does. The arithmetic is short. A 20 second cycle produces 1,440 mould layers in an 8 hour single shift, and each layer leaves the press on a pallet of 1,350 x 880 x 25 mm. If a block stays on that pallet through the 7 day natural cure before it is stripped and stacked in the yard, the fleet has to cover 7 times 1,440, or about 10,000 pallets, before you count a single spare. Cut the dwell with a stacked curing arrangement and a stacker that returns pallets the same day, and the requirement drops to roughly 1,500 pallets plus handling spares. Either way, price the steel, not just the machine. Stacked pallets also take floor area in the curing bay, so the yard plan and the pallet count are one decision, not two. Once stripped, the blocks still need 21 days in the yard.
4. Curing from the Mediterranean coast to the cold highlands
The coast and the inland plateaus do not cure the same way. On a mild, damp coast a green block holds its shape through a 7 day natural cure and is then stripped to the yard for the remaining 21 days of a 28 day schedule. In a cold highland winter the same mix stiffens slowly, early strength builds late, and a block stripped on day 7 can still be green in the middle. Extend the pallet dwell, keep the curing area covered, and do not judge the batch before the cubes reach their reference age. Above roughly 1,000 m the night temperature falls further and stays lower for longer, which matters more than the machine setting.
On the coast the risk runs the other way. Humidity is high, evaporation is slow, and a block that looks set can still be short of strength, while a mix that ran wet leaves pallets stuck to block faces. Keep the water to cement ratio set by weight rather than by feel, mist the yard instead of flooding it, and test at 7 and 28 days before you change anything in the mix.
5. Choosing a concrete block machine for Algiers, Oran or inland
Match the machine to the tallest building in your order book, not to your average job. If your work is single-storey housing and garden walls, the QST8-15 at 95 kN and 31.5 MPa already presses a 200 mm block, and its 14 t frame holds 90,000 standard bricks in an 8 hour shift and ships easily. Once four and five storey load-bearing residential blocks enter the order book, step up one grade. The QST1200 at 150 kN is the practical entry point for a concrete block machine in Algeria that has to hold a load-bearing strength class, and a plant feeding several multi-storey frames should be quoting the QST1800 at 280 kN. A block machine Algiers buyers shortlist and a block machine Oran buyers shortlist should answer the same question first: how much excitation force reaches a 200 mm mould.
6. What we confirm before quoting a line for Algeria
Our 11,500 x 4,550 x 2,800 mm QST1200 does not travel as one piece. The main frame, the hopper, the conveyor, the pallet feeder and the stacker are crated separately inside a 40 ft container of about 12,032 x 2,352 x 2,698 mm, and site assembly with commissioning normally takes 7 to 15 days. Plan on about 250 days of production a year on a single 8 hour shift, and double that with a second shift. Before we send a configuration we need four answers in writing: the block sizes and strength classes you sell, the voltage, phase and frequency you actually have on site, the crane or forklift capacity at the port and in your yard, and the sand, stone and cement you can buy locally.
Frequently asked questions
How much does a block making machine in Algeria cost?
There is no single figure, because the same press is sold as a manual line and as a fully automatic one, and the gap between those two versions is wide. Decide first how many operators you can afford per shift, then ask for a quotation on that configuration. Compare suppliers only when the automation level, the mould set and the pallet system are identical.
Which machine suits a multi-storey load-bearing block in Algeria?
For four and five storey load-bearing masonry, start at the QST1200: 150 kN of excitation force into a 200 mm mould at 31.5 MPa, a 15 to 25 second cycle, and 120,960 standard bricks in an 8 hour shift. A plant feeding several multi-storey frames should quote the QST1800 at 280 kN. Keep the QST8-15 at 95 kN for single-storey housing and partitions, where it is more than enough.
Why does excitation force matter more than cycle speed for a 200 mm block?
A 200 mm mould takes a larger charge of stiff, semi-dry concrete than a thin partition block, and that charge has to be densified through its full height before the press releases. More excitation force at the same 31.5 MPa does that inside a normal cycle. Chasing the shortest 15 second cycle instead leaves the bottom corners loose, and the block loses strength where the load will sit.
How many pallets does one shift of block production need?
At a 20 second cycle a single 8 hour shift makes 1,440 mould layers, so the fleet must cover every layer in the machine, in transport and in curing at once. With blocks held 7 days on 1,350 x 880 x 25 mm pallets for a natural cure, that is about 10,000 pallets. Return pallets the same day with a stacker and a stacked curing layout and roughly 1,500 pallets plus handling spares will do.
How long does block curing take in the highlands compared with the coast?
The usual natural schedule is 7 days on the pallet, then stripping to the yard for the remaining 21 days of a 28 day cure. On the humid coast that schedule holds well. In a cold highland winter the same mix builds early strength slowly, so a block stripped on day 7 can still be green in the middle. Extend pallet dwell and cover the curing area.
What should I verify before ordering a concrete block machine in Algeria?
Confirm four things in writing before a quotation is built. The block sizes and strength classes you actually sell, the voltage, phase and frequency at the site, the crane or forklift available at the port and at your yard, and the sand, stone and cement you can buy locally. Also confirm the foundation pad layout and the space left for the curing yard.
Want an engineering opinion on your project?
Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.