Can you supply a complete block production line, not just a machine?
Yes. We supply the forming machine together with batching and mixing, conveying, curing, cubing and packing equipment, and we design the flow between them. The line is scoped to your plot and your output target.
How do I choose between automatic and semi-automatic?
Choose by output, labor cost and how much you can prepare the site. Automatic lines give a repeatable workflow and lower labor per block, but they need more site preparation and a clear production plan. Many plants start semi-automatic and add automation as sales grow.
What information do you need to quote a line?
Block sizes, target output, raw materials, site power and plot dimensions. With those five we can propose a machine and line configuration and send a layout drawing with the quotation.
Do you train our operators?
Yes. Installation and operator training are agreed as part of the project scope, so your team can run the machine and handle mould changes and routine maintenance themselves.
Which supplier can deliver a block making machine to Baghdad, and what does it cost?
We ship from our own factory in Quanzhou, China to the port serving Iraq, with the inland leg to Baghdad, Basra, Erbil, Mosul, Najaf or Karbala quoted per project. Cost is not a single figure: block sizes, mould plan, target output, automation level and the site electrical specification all move the total. Send those inputs and the quotation covers that scope.
Can you deliver to Basra, Erbil and Mosul as well as Baghdad?
Yes. We quote inland delivery for Baghdad, Basra, Erbil, Mosul, Najaf and Karbala against the same production scope, and we agree the unloading arrangement for each site before the order.
What block types sell best in Iraqi projects?
Hollow blocks for walls and solid blocks for structural work carry most volume, and interlocking pavers are added where the project also serves roads and yards. Tell us which of these you intend to sell and the mould plan follows.
What is the difference between the QST1200 and the QST1800?
Pallet, steel and power. The QST1200 forms on 1,350 x 880 x 25 mm at 17 t and 57.6 kW with 150 kN of vibration force. The QST1800 forms on 1,400 x 1,400 x 30 mm at 34 t and 104 kW with 280 kN. Both run a 15 to 25 second cycle at 31.5 MPa, so the larger machine buys forming area, not speed.
How much electrical capacity does a block machine need in Iraq?
The figure is published per model: 44.9 kW installed on the QST8-15, 57.6 kW on the QST1200 and 104 kW on the QST1800, with the stacker a separate 3.0 kW on the smaller machines. Send the transformer capacity and the changeover you have, and the machine list is built around that, not the other way round.
How many hollow blocks does a QST6-15 make in one shift?
Six hollow blocks of 390 x 190 x 190 mm per mould, and 8,640 to 11,520 pieces in an eight hour shift, which is the published figure for that model. A larger order book moves you to the QST8-15 or the QST1200, where the wider pallet carries more cavities inside the same 15 to 25 second cycle.
Which cuber matches a QST8-15 in an Iraqi plant?
Match on pallets per shift rather than on size. The QST8-15 forms on a 980 x 860 mm pallet at 15 to 23 s, so a single-station cuber clearing about 1,700 pallets per shift covers a one-shift plant with margin, while the double-station unit at about 3,800 pallets per shift suits two or three shifts. Ask for the pallet figure, not the block figure, when you compare quotations.
What happens when the cuber is slower than the press?
Pallets queue on the discharge conveyor, the feeder magazine empties faster than it is refilled, and the press waits with a formed block still on the pallet. The loss does not show on the machine panel. It shows as a shift total below the published range, which is why the handling cycle is quoted beside the press cycle in a serious quotation.
How much power do the pallet feeder and cuber add to the site load?
The QS-1200 feeder adds 3 kW, and the cubers range from 15 kW on the QS-1000G-A to 44 to 45 kW on the double-station QS-1000G-C. Those units run while the press runs, so they belong in the same total as the host machine when you size a supply connection or a generator for the plant.
What must be ready on site before a block machine arrives in Iraq?
Four things: the foundation with anchor holes drilled to the machine drawing, a power entry sized for the host plus the stacker and the pallet feeder, pallets in the size the model uses, such as 980 x 680 x 20 mm on a QST6-15, and rack space for green block. The machine can be unloaded without them, but it cannot make a sellable block.
Should the foundation be poured before the machine ships?
Yes, and that is the point of ordering the drawing early. The anchor positions are taken from the machine drawing and the block that carries a 12 t QST6-15 or a 34 t QST1800 has to cure before the frame is landed on it. Pouring after arrival turns a concrete wait into idle machine time.
Can commissioning start before the curing area is ready?
The machine can run empty cycles and you can check the mould and the stacker, but production cannot start. Green block leaves the press on its pallet and has to go straight to a rack, stacked to the height the cuber is set for, which is 1,300 mm on a QS-1000G-A and 1,100 mm on the pallet-free wet-batch line.