Quick answer

Transformer capacity for a block plant is sized from a load list and ordered in kVA, while every machine is specified in kW. All our machines run on 380 V, 50 Hz, three phase, from 34.4 kW installed on the QST6-15 to 104 kW on the QST1800, and a QS-1200A cuber adds 34.15 kW on the same feed. The utility grants a kVA figure and limits the voltage dip at start, so the application is built from the press, the mixer, the conveyors, the compressor, the pumps and the lighting, plus the start of the largest motor. Sizing from the press nameplate alone leaves a plant that trips every morning.

Get a price on WhatsApp Or send a written enquiry

The transformer is usually the last item a buyer prices and the first one that stops a plant. It sits outside the machine supply, it is bought locally, and it is ordered from a form that asks for one figure: kVA. The machine data sheet answers in kW. A plant that treats the two as the same number either pays for capacity it does not need or finds in the first week that the press cannot hold its cycle.

Nothing here replaces the utility calculation. It is the input that calculation needs from the machine side, and the part a buyer can settle before ordering anything.

Why the data sheet says kW and the utility asks for kVA

Installed kW is the real power the motors deliver at the shaft. A motor is also an inductive load: it draws magnetising current that does no mechanical work but still loads the transformer and the cable. The utility grants and charges in kVA, the sum of the two, and applies its own power factor. Ask which factor they apply and where they measure it, at the meter or at the transformer, before converting. Two buyers with the same machine can be granted different kVA when their metering points differ.

Voltage and frequency belong in the same conversation. Every machine we build is designed for 380 V, 50 Hz, three phase, and the panel, motors and settings are built for the supply named in the order. A site at 400 V or 415 V, or on 60 Hz, does not simply connect: the electrical package has to be ordered for it. Fixing that after the container lands means new windings or a new panel.

Installed kW is not the load the transformer sees

A block machine does not draw its installed capacity at once. The QST1800 lists 104 kW, yet the stacker inside that figure is 3.7 kW, the vibrators run for the pressing part of the cycle, and the pump loads in the same seconds. Feeder, conveyor and stacker work in the gaps. Summing nameplates sizes the transformer for a moment that never happens, and the capacity charge follows that figure for years.

Build the list by function and apply a demand factor to the loads that genuinely overlap, then verify on site: clamp the incoming feeder for one full production day and write down the highest and lowest reading. The highest sets the running load, the lowest tells you what the supply does in the evening, when every other customer on the same feeder is drawing.

Installed power across the range

The figures below come from the model pages on this site, shown with pallet and vibration force because the three move together: a larger pallet needs a heavier beam, more force and more installed power.

ModelPalletVibration forceInstalled power
QST6-15980 x 680 x 20 mm68 kN34.4 kW
QST8-15980 x 860 x 22 mm95 kN44.9 kW
QST10001,100 x 880 x 25 mm105 kN48.9 kW
QST12001,350 x 880 x 25 mm150 kN57.6 kW
QST15001,350 x 1,150 x 30 mm220 kN69.1 kW
QST18001,400 x 1,400 x 30 mm280 kN104 kW

Then add every load the press does not include

The press is one line on the list. A QST1200 at 57.6 kW with a QS-1200A cuber at 34.15 kW is 91.75 kW installed before a mixer, a conveyor, a compressor, a water pump, curing fans or lighting is counted.

The batching side is easy to forget because it is often bought separately, and its motor belongs on the same list, as does the starting method of every large motor. Walk the list in the order the plant runs: batching, mixing, conveying, forming, stacking, cubing, curing, lighting. A load left off the list is one the transformer meets anyway, at the worst hour.

The start of the largest motor decides the kVA as often as the running load

A motor started direct on line pulls roughly two and a half to three times its running current for a few seconds, and the transformer must carry that without dropping a contactor or resetting the controller. A star delta or soft starter lowers the surge and costs less than the next transformer size up.

This matters more on a shared feeder. Where the transformer also carries houses or a neighbour plant, your start is visible to them, and the utility sets the permitted dip accordingly. Put the largest motor, its rating and its starter on the application, not only the total kW.

Distance from the transformer to the panel belongs in the same calculation

Cable section follows three inputs together: the load, the one way length and the drop accepted at the terminals. A 34.4 kW machine beside the transformer and a 104 kW machine at the far end of a long yard do not take the same conductor. Drop is cumulative, and an undersized run makes the motor draw more current for the same torque.

The transformer and the cable are two purchases and one calculation. If the transformer is yours, the same list sizes it. If it belongs to the utility, the kVA you are granted is argued from the machine data sheet, which is why the sheet should travel with the quotation.

What to send before the transformer is ordered

Six answers remove most of the rework, and five of them come from the site rather than from the machine.

  • Machine model and count, and whether a second press is planned within two years.
  • The ancillary list with ratings: mixer or batching machine, conveyors, compressor, water pump, curing fans, lighting, workshop.
  • Measured voltage and frequency at the panel position, on all three phases, with the lowest evening reading.
  • One way distance and route from the transformer to the panel, and whether the cable is already laid.
  • The kVA the utility has offered, the power factor they apply, and the starting dip they permit.
  • Who supplies and who terminates the cable, the panel and the earthing.

Send those six and we return the electrical data sheet with the matching panel drawing: installed capacity, the largest motor and its starter, the terminal arrangement and the earthing point. That sheet is what the utility and the cable supplier both need, and it is why a plant can be wired once, at the right size.

Price guides
Machines used in this process

Want an engineering opinion on your project?

Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.

Talk to an engineer

Related reading

Request a quotation

A machine list, a layout drawing and a price, usually within one working day.

We reply within 12 hours. Your information is never shared.

WhatsApp Us