How to Sell Blocks to Construction Companies: Four Steps

24 November 2026 · 7 min read

Quick answer

Block orders are won at the site, not at the purchasing desk. The site engineer accepts or rejects the load, the site manager decides whether a second truck is called, and the purchasing officer only moves the paper. Sell in that order: a sample tray and one delivered price to the engineer, a written delivery window to the site manager, then a framework volume, a credit line counted in blocks and a written breakage rule.

Get a price on WhatsApp Or send a written enquiry

Learning how to sell blocks to construction companies is a different trade from making them. A plant that has just commissioned a press can fill a mould in 15 to 23 seconds and still finish the month with a yard full of stock, because the person who signs the order is not the person who accepts the load. The order is won in the site office and tested at the gate.

Most new plants knock on the purchasing door first. The purchasing officer compares three quotations on price per block and forwards them, while the site engineer and the site manager decide which plant supplies the next wall. Approach the site first, the office second, the paper last.

Who actually decides a block order?

On a mid-rise building, three people touch your block before a mason lays it. The site engineer controls technical acceptance and can turn a truck around at the gate. The site manager controls the programme and decides whether a second load is called in. The purchasing officer controls the paper and the payment file, and has the least to say about which plant supplies the wall.

That split changes what you argue. With the engineer, argue dimension and record. With the site manager, argue timing. With the purchasing officer, argue terms. A plant that opens with price in front of the engineer leaves with nothing, because price is not his decision and he cannot defend it upward.

A trial delivery settles more than a presentation. One pallet of hollow blocks on one site, placed by the crew that will place the rest, gives the engineer a physical result and gives you a name to quote on the next job.

What to carry on the first visit

Four items travel in the truck, and the price sheet is the one read first. It also loses more first meetings than the sample tray wins, because a price per block ex works and a price per block landed differ by freight, and a buyer reads your first figure against a competitor's second. Quote on one basis, print it on the sheet, and state who unloads.

The site manager's next question is whether you can keep up. A QST6-15 runs 34.4 kW, presses at 25 MPa and vibrates at 68 kN on a 980 x 680 mm pallet, forming 6 hollow blocks per mould at 8,640 to 11,520 per 8 hour shift. Quote the low end of your range.

  • A sample tray in the sizes the job uses. On a 390 x 190 x 190 mm hollow mould the press yields 6 per mould, so a tray showing the corners of a full cavity is a real sample, not one block lifted off a stack.
  • A signed reference sample, stamped with the date, the mould number and the dimension ordered. Both sides keep one.
  • One price per block on a named delivery basis, with freight as a separate line, so the buyer sees what the truck adds to each block.
  • The batch rhythm you can hold: blocks per shift, and the day the next mould frees up.

How do you find the first three customers?

The first three need to sit inside the distance where the truck still leaves a margin. Three sources build that list in a week.

Freight sits inside the price of every block, so a job at twice the distance needs a higher price for the same margin, and the buyer sees that gap before he sees your quality. Sort by road distance from the yard, not by project size, serve the nearest three cleanly, and use them as references further out.

The arithmetic of a tender price is on /blog/pricing-blocks-for-tender-contracts/, and how a contractor shortlists a plant is on /blog/how-contractors-qualify-a-block-supplier/.

  • The contractor board on the site hoarding. It names the main contractor and the project, and often gives a number for the site office.
  • Tender notices. A published award tells you who won the work and when the block package starts, which is the week they need a supplier.
  • The laying crew. Foremen move between sites and are asked for a supplier name more often than any purchasing office is.

What loses the account after the first truck?

Accounts are rarely lost on price. They are lost on four failures that repeat, and each one shows on site before anyone writes a complaint.

The numbers behind a rejection belong on the technical page. The acceptance figures for Syria, tolerance band and curing days included, are on /blog/selling-blocks-syria/. What matters commercially is that the same numbers appear on the ticket as in the agreement, and the record set is on /blog/quality-control-records-for-block-supply-contracts/.

  • Batch drift. Colour and dimension must match between the pallet delivered in week one and the one delivered in week six. Change the aggregate source or the cement lot and the finished wall shows two shades.
  • Chipped corners. A broken angle at the pallet edge usually means the clamp closed on an overbuilt stack, and the mason sees it before the engineer does.
  • Late trucks. A load that arrives after the crew has gone home costs the site a day of laying, and that cost lands on your name rather than on the haulier's.
  • Strength given by word of mouth. A figure quoted at the gate with no test record behind it becomes a rejection on the day the site crushes its cubes.

Four people, four different proofs

Each person in the chain reads different evidence. Bring the one that matches the meeting, and leave the rest in the truck.

Who you meetWhat they actually measureWhat you bringThe usual mistake
Site engineerDimensional band and a test recordSigned reference sample and batch ticketOpening with the price sheet
Site managerWhen the truck actually arrivesA delivery window in writingVerbal timing promises
Purchasing officerPrice basis and who pays freightOne price delivered to siteAn ex works figure against a landed one
StorekeeperPallet count and who unloadsA numbered delivery ticketA count agreed by voice at the gate
Laying crew foremanGrip and how the stack opensStrapped packs with intact cornersStack height above the clamp limit

What turns a first load into a standing order?

A first load pays for a week. A standing order pays for the machine, and it rests on four terms that fit on one page.

  • Framework volume: a quantity over a stated period, with the price held inside a band so neither side reopens it every month.
  • Delivery window: the day and hour the site will take the truck, agreed with the site manager rather than with the office.
  • A credit limit counted in blocks rather than argued in words, so both sides point at the same figure when the file is reviewed.
  • A written rule for breakage, pallet return and short counts, with the sampling method named and the counting point fixed at the gate.

How is a credit limit calculated in blocks?

The figure is arithmetic, not judgement, which is why it survives a review. A QST6-15 forms 6 hollow blocks of 390 x 190 x 190 mm per mould and 8,640 to 11,520 per 8 hour shift. Three shifts at the low end is 25,920 hollow blocks in a day.

Set the limit at three days of that output and the buyer holds about 77,760 blocks before the payment clears, a figure to put in front of a partner or a lender. Write the breakage rule beside it, because the first claim always arrives inside the first month.

A plant that has just started shipping looks for a sales channel and finds a route. Three sites inside the freight radius, one engineer who answers your call, and four terms on one page carry a plant through its first year. After that the machine only has to keep the promise the sample tray made: 6 hollow blocks per mould, a 15 to 23 second cycle, and the same dimension on the last pallet of the month.

Frequently asked questions

How do you get the first meeting with a construction company?

Go to the site, not the head office. The contractor board on the hoarding names the main contractor and often the site office number, and a published tender award tells you which block package is starting. Ask for the site engineer, arrive with a sample tray and one written price basis, and leave the brochure in the truck.

What should a block supplier bring to a first site visit?

A sample tray in the sizes the job uses, a signed reference sample carrying its dimensions and mould number, one price per block on a named delivery basis with freight shown separately, and the shift output you can actually hold. Those four answer the engineer, the site manager and the purchasing officer in a single meeting.

Why does distance decide which sites are worth quoting?

Freight sits inside the price of every block, so the same margin at twice the distance needs a higher price per block, and a buyer comparing quotations sees that gap before he sees your quality. Rank the target list by road distance from the yard, serve the nearest jobs cleanly, and use them as references further out.

What makes a contractor stop ordering from a block plant?

Colour and dimension drift between batches, chipped corners at the pallet edge, trucks that arrive after the crew has left, and strength figures given by word of mouth with no test record behind them. Each is a repeatable failure rather than bad luck, and each is closed by a written rule signed before the first truck leaves.

How should a credit limit be set for a block supply account?

Count it in blocks, not in words. A QST6-15 forms 6 hollow blocks per mould and 8,640 to 11,520 per 8 hour shift, so three shifts at the low end is 25,920 blocks a day. A limit of three days of output is about 77,760 blocks, and both sides can check that figure against delivery tickets.

Price guides
Machines that fit this
Machines used in this process

Want an engineering opinion on your project?

Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.

Talk to an engineer

Related reading

Request a quotation

A machine list, a layout drawing and a price, usually within one working day.

We reply within 12 hours. Your information is never shared.

WhatsApp Us