Power

Solar Power for a Block Plant: What PV Can and Cannot Carry

24 November 2026 · 6 min read

Quick answer

PV can carry the steady loads of a block plant: the mixer, the conveyors, the compressor, the water pump, the curing fans and the lighting. It cannot be sized from the press nameplate alone, because the press draws in bursts, cycles every 15 to 25 seconds and asks for a start current several times its running current. The design that works is a hybrid: PV for the day, a battery for the evening and the control panel, and a generator or the grid for the press where the inverter cannot absorb the surge. Your load list in kilowatts, and when each item runs, decides the array, not the roof area.

Get a price on WhatsApp Or send a written enquiry

A block plant is a good candidate for solar and a bad candidate for a solar kit, and the difference is in the load profile. The plant runs a day shift, the sun is strongest at the hours when the machine is busiest, and much of the electrical load is steady rather than spiky. What makes it hard is one item in the list: the press, which is why a designer cannot simply divide a daily kilowatt hour figure by the panel output.

Every figure here comes from the specifications published on this site: installed power of the models, cycle time, start current of a direct on line motor, and diesel burn at 0.2 to 0.25 litres per kilowatt hour. We do not sell panels or inverters. What we can do is give you the electrical data sheet a solar contractor needs, so the array is sized on your plant rather than on a guess.

Start from the load list, not from the nameplate

Installed power runs from 22.9 kW on the QT4-15 to 104 kW on the QST1800, with 34.4 kW on the QST6-15, 44.9 kW on the QST8-15, 57.6 kW on the QST1200 and 69.1 kW on the QST1500 in between. That ladder is the first number a solar designer needs and it is also the number that misleads him, because a nameplate is a peak for motors that do not sit at peak all day.

The working figure is the site supply, and it is smaller. A QST6-15 at 34.4 kW installed runs on roughly 30 kW of site supply, because the vibrators and the hydraulic pump are seldom at full draw at the same moment. At 30 kW over an 8 hour shift the plant needs about 240 kWh a day, and that figure, not the nameplate, is the energy a PV array has to replace.

Why the press decides the design

A cycle of 15 to 25 seconds is a sequence of positions: mould down, feed box across, vibration on, press closed, strip lifted, pallet advanced. The load follows that sequence, so the current is not smooth. When the vibrators and the pump start, the draw steps up and the voltage at the panel follows it down. A generator absorbs that step with rotating mass. An inverter absorbs it with electronics that are rated in kVA and protected against overload.

Two details matter more on PV than on a generator. A direct on line start pulls roughly 2.5 to 3 times the running current for a few seconds, and a star delta or soft starter lowers that surge for less money than a larger inverter. And a panel that loses its position mid strip does not simply restart: the drive has moved, the counter has not, so the next cycle begins from a position the machine is not in. A PV supply that browns out on a cloud edge shows that failure before it shows a low kilowatt hour day.

What a PV array genuinely covers

Most of the load list is a good match for midday generation, and that is where the savings sit rather than in the press.

  • The mixer or batching unit. Its motors run for most of the batch, and the duty is close to continuous while production is going.
  • The conveyors and the feed belt. Steady draw, no surge, and they stop when the press stops.
  • The compressor and the water pump. Both are steady loads, and the compressor is the one a solar designer usually forgets to put on the list.
  • Curing fans, lighting, the office and the workshop. Small each, but they run all shift and they are the first load a partial array can cover.

Three layouts and what each one buys

The layouts below are ordered by risk, not by price. Each one assumes a load list of about 30 kW during a day shift.

LayoutWhat it coversWhat you give up
PV and battery, press on battery inverterThe whole plant in daylight, evening loads from the batteryThe inverter must be sized for the start surge, and a long cloudy spell stops production
PV and battery, press on gridSteady loads and the panel from PV, press from the gridYou still depend on the grid for the press, so a weak grid still costs shifts
PV, battery and diesel set, off gridThe plant on any site, with PV cutting the hours the set runsCapital for three systems and one control scheme that must switch cleanly

The diesel arithmetic you can do today

A diesel set burns about 0.2 to 0.25 litres per kWh, so a plant drawing 30 kW over 8 hours uses about 48 to 60 litres a day, with 54 litres at the midpoint. Multiply by your own fuel price and by the working days in your year, and you have the annual fuel line that a PV array competes against. That number is knowable before anyone quotes a panel.

For the other side you need a local figure we cannot supply: the delivered cost of a kWp installed at your site, which moves with freight, mounting, cable runs and inverter class. Ask for it as a price per kWp and a yield per kWp per day, then compare with your litres. An installer who cannot state both is guessing.

What to send your installer and what to send us

A solar contractor can design a block plant supply from one page, if the page is right. Send the same list to him and to us, and the two designs will agree.

  • The machine model and how many, and the installed power on the data sheet.
  • Every ancillary load with its rating: mixer, conveyors, compressor, water pump, curing fans, lighting, office.
  • Shift hours, and the longest day in your season.
  • Site voltage and frequency: 380, 400 or 415 V, and 50 or 60 Hz. The motors and the panel are ordered for one of them.
  • Which circuits must never drop, and whether the changeover between sun, battery and set is manual or automatic.
  • Whether grid power is expected in the next two years, and whether a second machine is planned.

Frequently asked questions

Can a block machine run on solar alone?

A small line in a day shift can, if the inverter is sized for the start surge and a battery carries the evening and the control panel. A QST1200 at 57.6 kW or a QST1800 at 104 kW is a different proposition, because the surge and the duty cycle are larger and one cloudy afternoon costs a shift. For those, PV is a fuel saver beside a firm source, not a replacement for it.

How many kWp does a plant with a QST6-15 need?

Start from about 30 kW of site supply over an 8 hour shift, which is about 240 kWh a day. If your site gives five effective sun hours, the array needs about 48 kWp before battery losses, and the battery has to hold the evening and the panel. Confirm the sun hour figure locally: it is the one input that changes the answer most.

Is solar cheaper than running the diesel set?

It depends on two numbers you can find today, your fuel price and your installed cost per kWp, and one you cannot: how many years the site will run. The litres figure is fixed by the load, at 0.2 to 0.25 litres per kWh. Build the comparison on annual litres against annualised panel cost, and keep the set in the model for the press and for the cloudy week.

Does a solar supply affect the machine warranty?

The machine is ordered for a stated voltage and frequency, and a warranty argument starts when the panel sees something else. Agree the supply design before the electrical data sheet is signed, tell us if the neutral or the earthing is unusual, and keep the changeover documented. A supply that holds voltage under the press surge is the condition that matters, not the source of the electrons.

Do you supply the panels and the inverter?

No. We build block machines and production lines, and the electrical package inside the machine is ours. The array, the inverter and the battery are bought locally or from a solar contractor, and our part is the data sheet that lets him size them on the real load rather than on a nameplate.

Price guides
Machines that fit this
Machines used in this process

Want an engineering opinion on your project?

Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.

Talk to an engineer

Related reading

Request a quotation

A machine list, a layout drawing and a price, usually within one working day.

We reply within 12 hours. Your information is never shared.

WhatsApp Us