Block Stacking Machine Price for Small Factory: When It Pays

23 October 2026 · 6 min read

Quick answer

A small factory starts to justify a cuber at about 300 pallets a day, because a four-man crew clears roughly 200 pallets in an eight-hour shift. The QS-1000G-B separates brick from pallet directly and runs about 2,000 pallets per shift at 16 seconds per layer. The QS-1000Y crawler gives about 1,300 pallets a day and follows a rented yard. Payback is counted in shifts removed, not in price.

The block stacking machine price for small factory work is decided by one figure you can count this week: pallets leaving the press per shift. A cuber is priced by the stations it carries, the layer cycle it holds and the stack it builds, so two machines that look alike on a quotation can differ twofold in output. The useful question is how many pallets a day the machine must handle before it replaces a crew. Below about 300 pallets a day, a four-man crew still strips pallets and builds stacks for less. Above that line the crew becomes the constraint and the machine starts to earn.

Which station becomes the bottleneck first?

Walk the line and time four points: brick-pallet separation, brick dividing, stack building and truck loading. The press is rarely the limit on a small plant. A QST8-15 forms up to 90,000 standard bricks in an 8-hour shift and a QSMT1000 reaches 135,000 bricks in the same time, so the yard receives a pallet every few seconds and the crew has to clear it at that rate. Separation at the curing yard is where the queue starts, because it is the one job that still depends on hands and on how cleanly the green brick releases from the board.

Dividing comes second. A product that is square once two pallets are combined can be cubed without splitting the layer. A product that is not square must be divided first, and that station, manual or hydraulic, decides whether a simple cuber fits at all. Stacking and loading follow, and loading is the last place a crew hides a shortfall: a stack that cannot take forks costs a man on the truck for every load.

What the entry-level cuber actually does

The QS-1000G-B is the first machine to price when the product is square after combining. It separates brick from pallet directly, with no dividing station, and builds the cube from the pallet up. Cycle time is about 16 seconds per layer and capacity is about 2,000 pallets per shift, on 29 kW of installed power. Stack height reaches 1,400 mm, the clamp takes a 500 kg layer, and the minimum clamping height is 250 mm. The frame covers roughly 19,000 x 6,000 x 5,500 mm and weighs about 9,000 kg, so it stands on a normal slab.

What you give up is range. With no dividing station the layer must already match the stack footprint, which ties the machine to a narrow product set, usually hollow block or a solid brick that combines into a square. Change shape every week and the saving disappears in reset time, because the crew goes back to the pallets between runs.

How many pallets a day makes a cuber cheaper than a crew?

Count pallets, not bricks. A four-man crew stripping and stacking by hand clears roughly 200 pallets in an 8-hour shift, and the rate drops in the last two hours, when the yard is hot and the stacks are far from the press. That puts the working threshold near 300 pallets a day. Under it, a machine stands idle for most of the shift while you still own it, and a crew that also sweeps the yard and loads trucks is the better use of the wage bill.

Place your own count on this ladder, measured at the press over the busiest week of the year.

  • Under 300 pallets a day: manual. One crew, no machine, and the yard layout decides the rate.
  • 300 to 800 pallets a day: the QS-1000G-B at 2,000 pallets per shift runs at 15 to 40 percent of capacity, so a breakdown costs hours instead of the day.
  • 800 to 1,500 pallets a day: the same machine runs at 40 to 75 percent of capacity, the band where a cuber is cheapest per pallet.
  • 1,500 to 2,000 pallets a day: one station needs a full shift plus another man on pallet supply.
  • 2,000 to 3,800 pallets a day: the double station, rated at about 3,800 pallets per shift.
  • Above 3,800 pallets a day: two double stations, because one machine is already at its limit.

When does the double-station machine earn its extra steel?

The QS-1000G-C adds a second cuber system and a second brick-out system, so two-way cubing runs left and right at once. Cycle time falls to about 13 seconds per layer and capacity rises to about 3,800 pallets per shift, with 44 to 45 kW installed and about 12,000 kg of machine. Stack limits stay where the single station sits: 1,400 mm maximum and 250 mm minimum clamping height.

The extra steel earns its place when a single station needs a second shift to clear the day. At 2,000 pallets a day the QS-1000G-B is fully loaded for one shift, and the second shift brings a supervisor, a forklift driver and lights. The double station clears that day in one shift, so the comparison is one machine shift against two crew shifts. That count decides the order. Below 2,000 pallets a day the second station sits idle half the time.

Does a rented yard change the machine you should buy?

A fixed cuber is a building decision. The QS-1200A needs about 12,000 x 3,000 mm of floor, weighs approximately 18,000 kg and draws 34.15 kW. Installed at the curing yard it builds stacks where they cure, with one operator and about 3,800 pallets per shift, into 1,000 to 1,200 mm square stacks of 125 standard solid bricks or 18 standard hollow blocks per layer. Move the yard and you move the slab, the cable trench and the machine.

The QS-1000Y answers the lease. It is crawler mounted at 5,000 kg and 15 kW, walks at about 2 km/h and runs on a remote control, so one man stands where the stack is going rather than where the machine is bolted. Transport width is 1,900 mm, so it leaves on a flat trailer when the lease ends. It stacks up to 20 layers of solid brick or 11 layers of hollow block, handles about 1,300 pallets a day, and cubes wherever the bricks are, which removes the pallet return trip across the yard.

What to measure before you request a quotation

Five numbers turn a quotation into a comparison, and all five come from your own yard.

  • Pallets per day in the peak week, counted at the press, not averaged over the year.
  • Layers per pallet and curing stack height, against the 1,400 mm ceiling on the fixed machines.
  • Whether the product is square after two pallets are combined, because that answer decides if you need a dividing station.
  • Distance from press to curing spot, which sets how much of the day a crawler spends walking at 2 km/h.
  • People on the yard today, and which of them you would move to loading instead of releasing.

Ask for pallets per shift at your own layer height, the cycle in seconds and the clamping height range, all in writing, then set them against your count. A machine that covers the peak day in one shift with a fifth of the shift spare is sized right. One that needs three shifts is a machine you will resell.

Frequently asked questions

How many pallets a day justify a stacking machine in a small factory?

About 300 pallets a day is where a machine starts to compete with a four-man crew, because that crew clears roughly 200 pallets in an 8-hour shift. Between 300 and 800 pallets a day a QS-1000G-B rated at 2,000 pallets per shift is lightly loaded, but it still removes the heaviest job in the yard. Below 300, keep the crew and spend on yard layout instead.

What does the double-station cuber add over the single-station model?

A second cuber system and a second brick-out system, so two-way cubing runs on the left and right at once. Cycle time falls from about 16 to about 13 seconds per layer and capacity rises from about 2,000 to about 3,800 pallets per shift. Power goes from 29 kW to 44 or 45 kW and machine weight from 9,000 kg to 12,000 kg. It earns that when one station would need a second shift.

Does a mobile cuber suit a rented yard?

Yes, and that is its main case. The QS-1000Y is crawler mounted, weighs 5,000 kg, draws 15 kW and walks at about 2 km/h under remote control, so it needs no foundation and no cable trench. It stacks up to 20 layers of solid brick or 11 layers of hollow block and handles about 1,300 pallets a day, then leaves on a trailer 1,900 mm wide when the lease ends.

Which products rule out a simple cuber without a dividing station?

Any product that is not square once two pallets are combined. The QS-1000G-B separates brick from pallet directly and builds the cube from there, which assumes the layer already matches the stack footprint. Hollow block and solid brick that combines into a square fit. Kerb stones, pavers and long shapes need a dividing station first, and that station is the part of the price a simple cuber leaves out.

What stack height can a small cuber build?

The fixed machines stop at 1,400 mm of cube height, with a minimum clamping height of 250 mm and a clamp rated for a 500 kg layer. The QS-1200A builds 1,000 to 1,200 mm square stacks of 125 standard solid bricks or 18 standard hollow blocks per layer. The QS-1000Y goes further in layer count, up to 20 layers of solid brick or 11 of hollow block, because it stacks in the open yard.

Machines used in this process

Want an engineering opinion on your project?

Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.

Talk to an engineer

Related reading

Request a quotation

A machine list, a layout drawing and a price, usually within one working day.

We reply within 12 hours. Your information is never shared.

WhatsApp Us