Quick answer
One mould for every product you can sell every month, plus one spare set for the block that fills most of your shift. A mould is cut for one footprint on one press, so count products, not shapes in a catalogue. A fifth set that runs twice a year is capital asleep.
How many moulds should I buy with a block making machine? Count the products you can sell every week, then add one spare set for the block that keeps the yard full. That is the whole rule. A mould is not an accessory you collect: it is a matched set of frame, core, base plate, guiding assembly and positioning parts, cut for one footprint on one press, and it earns nothing while it sits on the rack.
Buyers err in two directions. One orders a set for every shape in the catalogue, then runs four of them hard and two twice a year. The other keeps a single mould with no spare, and the press stands still for as long as that mould is away for repair. The count sits between those two, and the number comes from your order book, not from the catalogue.
One mould fits one press, and the press fixes the cavity count
A mould ships as a matched set: frame, core, base plate, guiding assembly and positioning mechanism. Replace one part from another set and the fit is gone. The cavity count is not a free choice either. It follows the moulding area of the press and the footprint of the block. On a QS1500 press the moulding area is 1,440 by 850 mm, and one mould of 200 by 100 by 60 mm floor tile yields 40 pieces in a standard cycle. Put a 390 by 190 by 190 mm hollow block in the same area and the cavity count falls, because every cavity needs the full block footprint plus a steel wall around it.
This is why a mould from another machine rarely drops in. The pallet decides too. QST6-15 runs a 980 by 680 by 20 mm tray, QT5-15 runs 1,100 by 650 by 20 mm. Different tray, different base plate, different positioning, so a plant with two machine models needs two sets. Ask for the mould drawing with the cavity layout dimensioned, and check it against the tray drawing before the order leaves your desk.
How many products can you actually sell this year?
Write the products down with a monthly quantity against each, and keep only the lines you can ship every month. A 390 by 190 by 190 mm hollow block for a wall contract, a 240 by 115 by 51 mm standard brick, a 200 by 100 by 60 mm paver: each is a mould, and each is worth ordering only if the volume repeats. Two products at steady volume support two moulds. A third needs a third order book behind it.
A fifth mould that runs twice a year is capital asleep. It costs twice over: once at purchase, and again in the changeover hours you spend fitting it and pulling it out for a few hundred blocks. The test is blunt. If a product cannot fill a shift on its own volume, leave it out of the first order. Let the orders arrive first, then have the mould cut for the shape the market actually buys.
What does a mould change cost you in downtime and scrap?
A change is a sequence, not a swap. Isolate and lock out the press, release the mould clamps, unbolt the frame, lift the set out on its lifting points, clean the seating faces, land the new frame and base plate, bolt and torque, refit the core, then re-enter the recipe in the PLC: cycle time, pressing pressure, vibration. On a press rated 25 MPa with 68 kN of excitation force, those settings belong to the mould, not to the machine, and a recipe left over from the previous shape shows up in the first blocks.
Then you pay for the first blocks. A new set runs tight, so the opening cycles arrive with fins at the parting line, a slight height difference between cavities, and edges that crumble on the green block. Those blocks carry the full material and the full energy and go back as scrap. Weigh them across one change instead of guessing. That weight is the entry ticket you pay every time you run a shape you do not sell in volume.
Log the change in hours on your own clock, the first time with a stopwatch, and write the figure beside the product list. That number, not the mould price, decides whether the fifth shape earns its place. Stored recipes and fault alarms shorten the re-entry: the mid-size machines are quoted at about 30 percent of troubleshooting time saved.
Which mixes wear a mould fastest, and how do you see it on the block?
Abrasion comes from the aggregate, not from the cement. Steel slag, slag, coal gangue, ceramic granules and crushed construction waste are hard and angular. A line set up to replace natural aggregate with 60 percent or more industrial waste wears a mould faster than a sand and gravel mix on the same press. Heat treated mould steel and CNC machining to micron level raise the ceiling, but they do not cancel the mix.
The block reports the wear first. A sharp arris turns rounded, and the block starts to look tired beside a competitor's. Fins appear along the parting line, cavity heights drift apart, and a core that once released cleanly begins to drag and scuff the inside of a hollow block. Check one block from each cavity at the start of every shift with a caliper and write the reading down; the caliper sees the drift weeks before the eye does.
When does a second set pay for itself?
Three cases carry the money. The first is the high-volume block: when one product fills most of the shift, a second set of the same profile keeps the press forming while the working set is serviced, and removes the days you would otherwise lose waiting. The second is a seasonal product you cannot deliver late, where the spare is insurance rather than capacity. The third is a real second profile, a kerbstone beside a paver, sold to the same customer in the same order.
The set that fails all three tests is the one bought for a tender you have not won. Hold the order until the purchase order lands. A mould is cut for one footprint on one press, so it does not transfer to the next machine, and a set bought for a lost tender sits on the rack with no future.
What should you send with the mould order?
A supplier can only cut what you describe. Six items decide whether the set arrives ready to bolt on and run.
- A dimensioned drawing of every block, with the arris radius and chamfer marked, not a photograph of a block you liked on another site.
- The cavity layout you want, with the number of cavities and their arrangement across the moulding area, agreed against the press drawing.
- The pallet or tray size and thickness, for example 980 by 680 by 20 mm or 1,100 by 650 by 20 mm, with the material and the wear strip named.
- Expected annual quantity for each product, because that figure orders the moulds: which one is cut first and which one waits a year.
- The machine model, its moulding area and its rated pressure, so the set is matched to your press and not to a similar model two sizes away.
- The mix you actually run and the strength you sell on, because an abrasive mix changes the steel grade and the heat treatment worth asking for.
Frequently asked questions
How many moulds should a new block plant order at the start?
Two, and a third only against a signed order. Pick the block that fills most of the shift and one second product you already have buyers for, then keep the third shape on the drawing board until the volume repeats. Two moulds on one press can both run in the same week; a fifth set bought for the sake of a catalogue does not.
Does a second block machine need its own moulds?
Yes, in almost every case. A set is cut for the moulding area, the base plate and the positioning of one press, and the tray decides the base plate. QST6-15 uses a 980 by 680 by 20 mm tray while QT5-15 uses 1,100 by 650 by 20 mm, so the two sets do not interchange. Order each set against the drawing of the machine it will run on.
How long should a mould change take?
Measure it instead of assuming it. Time the first change with a stopwatch and split it into the mechanical part, unclamping, lifting, cleaning the seating faces and bolting the new frame, and the setting part, where cycle time, pressure and vibration go back into the PLC. The second figure is the one that grows when operators skip the recipe.
What wears a mould out fastest?
Hard, angular aggregate. Steel slag, slag, coal gangue and crushed construction waste cut the cavity walls and the core faster than a rounded sand and gravel mix, and a line running 60 percent or more industrial waste feels it soonest. Watch the arris on the block, then the fins at the parting line. When the corner rounds, the set is near the end of its accurate life.
Should I keep a spare mould for my best-selling block?
Yes, when that block fills most of the shift. A spare set of the same profile lets you service the working set without stopping the press, and it removes the days lost waiting for repair or re-machining. If the block runs one shift a week, the spare is dead money: the press can wait for the repair, and the capital belongs in the product that sells.
Want an engineering opinion on your project?