Buying guide

Import Block Making Machine from China: Landed Cost Lines

18 November 2026 · 7 min read

Quick answer

Landed cost is five lines rather than one price. Goods value is the only line the factory owns. Packing follows the weight and dimensions of each package, freight follows volume and weight to a named port, insurance follows the declared value and weight, and destination charges, duty and the inland leg are quoted by your own broker and haulier. Ask for the five lines separately and compare landed numbers.

Get a price on WhatsApp Or send a written enquiry

What are the five lines of a landed cost?

When you import block making machine from China, you are buying five separate lines of cost, and each line has a different owner. Only the first belongs to the factory. The other four are priced by a forwarder, an insurer, your broker and your haulier, which is why two buyers on the same machine can land it at numbers that sit far apart.

Line one is the goods value, ex-works or FOB, and the gap between the two is who pays to move the machine from the factory gate to the ship. Line two is packing and the shipping envelope. Line three is ocean freight, charged on volume and weight to the port you name. Line four is cargo insurance. Line five is destination charges, duty and the inland leg. A quotation that gives one number hides four of these, and the buyer learns which four after the vessel has sailed.

LineWhat sets the numberWho quotes it
Goods value, ex-works or FOBModel, mould set, what the price already includesThe factory
Packing and shipping envelopeWeight and dimensions of each packagePacking engineer at the factory
Ocean freightCubic measure, gross weight, the port you nameFreight forwarder
Cargo insuranceDeclared value, declared weight, routingYour insurer or the forwarder's broker
Destination charges, duty, inland legClassification, value, distance, site accessYour own broker and haulier

Where does the shipping envelope come from?

Packing is a consequence, not a choice. A QST1800 measures 15,500 × 5,500 × 3,200 mm and weighs 34 t, a QST1200 measures 11,500 × 4,550 × 2,800 mm at 17 t, and a QST6-15 measures 9,450 × 3,300 × 2,700 mm at 12 t. Those are three different freight problems rather than three sizes of one design, and the crate, the skid and the lifting points are drawn from the envelope.

The host is not the only heavy package. A QS-1200A cuber covers 12,000 × 3,000 mm of floor and weighs about 18,000 kg, so the cube stacker can be the second lift on a plant and the wider one. Batching machine, mixer, conveyors, control panels and mould set travel as separate packages, each with its own weight, and the mould set changes with every product added, so a quotation written for one mould set does not describe a shipment carrying four.

The pallet fixes the width of both machine and crate: 1,400 × 1,400 × 30 mm on a QST1800, 1,350 × 1,150 × 30 mm on a QST1500, 980 × 860 × 22 mm on a QST8-15. Decide early whether the pallet fleet ships with the machine, because shipping it puts a consumable into the freight line at the same rate as the machine.

How is ocean freight priced before the port is named?

It cannot be priced until a port exists. Freight is quoted on two figures, the cubic measure of every package and its gross weight, and the carrier charges on whichever is larger. A forwarder who is given a country can only return a range. The same 34 t machine is a short sea movement to one destination and a transhipment to another, and the handling steps between factory gate and your yard follow the routing, not the machine.

This is where the envelope becomes money. An 11,500 × 4,550 × 2,800 mm machine is 11.5 × 4.55 × 2.8 = 146.5 m³ of bounding volume before packing, and a forwarder prices that space whether or not the machine fills it. Two machines of equal weight in different envelopes are not the same freight, and a pallet-free machine that packs into a narrow frame can cost less to move than a wider machine of the same weight.

Which documents must agree across all five lines?

Four documents carry the same facts into all five lines: the commercial invoice, the packing list, the bill of lading and the certificate of origin. The invoice states value, the packing list states weight and package count, the bill of lading states what was loaded, and the certificate of origin states where it was made. The broker reads them as one file, and the bank reads the same file when payment runs on a letter of credit.

They are produced by different hands. Invoice and packing list are typed in the factory office, the bill of lading is issued by the carrier after loading, the certificate of origin by a chamber. Three offices, three chances to type a different weight.

Build the file in one order. Fix the model and the mould set, weigh every package at the factory after packing, write the packing list from the weighing sheet, and pass the same sheet to the forwarder so the booking and the bill of lading are typed from one source. The certificate of origin then follows the invoice, and the four agree because they were never independent.

What goes wrong when the weights do not match?

A packing list that says 17 t beside a bill of lading that shows more stops the container at destination, because a broker cannot clear a declaration that contradicts the transport document. The correction costs a delay nobody planned: the container sits, storage runs, and the haulier arrives with a trailer and a crane sized from the wrong paper.

Under a letter of credit the same mismatch is a discrepancy, and a bank pays against documents rather than against the machine. A weight that differs between invoice, packing list and bill of lading is enough for the issuing bank to refuse the set, and the machine can stand on the quay while the money waits in an account that will not release it.

Insurance has its own version. Cover is written on a declared value and a declared weight, and an underwriter who priced 17 t will not settle a claim on 34 t without an argument. The declared value should carry the duty and the destination charges you would still pay on a total loss, because those costs survive the cargo.

The practical rule is one weighing sheet, taken at the factory after packing, signed, and used to type all four documents. Where a package is re-packed at the port, the bill of lading changes and the packing list has to be reissued the same day, or the file is out of step before the vessel leaves.

Which three inputs come before a landed number?

Three inputs decide the answer, and without them a landed figure is a guess with a number attached: the destination port, the model with its mould set, and the site access.

  • Destination port, named, with the inland point behind it. Freight and haulage are priced to a place, not to a country.
  • Model and mould set. The model fixes the envelope and the installed capacity, from 34 t and 104 kW on a QST1800 to 12 t and 34.4 kW on a QST6-15, and the mould set fixes the crate count.
  • Site access: gate width, the narrowest point on the road in, overhead clearance, the crane or forklift available in the yard, and the spot where the machine will stand when it leaves the truck.

How does site access change the inland line?

Inland transport and unloading are where the envelope turns into a route survey. A machine 15,500 mm long does not take a tight corner, and a 34 t package needs a crane on the day rather than a forklift. Photographs of the gate, with a tape measure in the frame, turn the last line from an assumption into a quote.

Send the product mix, the pallet size, the destination port and the power available at the site through the inquiry form. The reply sets out the five lines separately, each with what it contains and what it excludes.

Frequently asked questions

What does the FOB price of a block machine include?

FOB covers the machine packed and loaded on the vessel at the port of loading, plus the export paperwork. It excludes ocean freight, insurance, destination charges, duty and the inland leg. Ask the factory to state which packing is included, because sea packing is a separate item on some offers and it changes the envelope that freight is priced on.

Can a landed cost be quoted before the destination port is known?

No. Freight is priced on the cubic measure and gross weight of each package to a named port, and the routing changes the number of handling steps. A supplier who quotes a landed figure without asking for the port is quoting a country, not a delivery. Name the port and the inland point behind it, and the freight line can be priced.

What happens when the packing list weight differs from the bill of lading?

The broker cannot clear a declaration that contradicts the transport document, so the container is held while the file is corrected. Under a letter of credit the same difference is a discrepancy the issuing bank can refuse. Insurance also pays on the declared weight, so a claim on a heavier package can be argued down. One signed weighing sheet at the factory prevents all three.

Which documents must match for a block machine import?

Commercial invoice, packing list, bill of lading and certificate of origin. The invoice carries value, the packing list carries weight and package count, the bill of lading carries what was loaded, and the certificate of origin carries the place of manufacture. They are typed by three different offices, so the only reliable way to make them agree is to type them from one weighing sheet.

Does the machine model change the freight cost?

It changes the envelope, and the envelope is what freight is priced on. A QST1800 at 34 t and 15,500 × 5,500 × 3,200 mm is a different shipment from a QST6-15 at 12 t and 9,450 × 3,300 × 2,700 mm. The cuber adds a package of its own: a QS-1200A covers 12,000 × 3,000 mm of floor and weighs about 18,000 kg.

Price guides
Machines that fit this
Machines used in this process

Want an engineering opinion on your project?

Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.

Talk to an engineer

Related reading

Request a quotation

A machine list, a layout drawing and a price, usually within one working day.

We reply within 12 hours. Your information is never shared.

WhatsApp Us