Paver block thickness follows the load: 60 mm for footpaths and courtyards, 80 mm for driveways and light vehicles, 100 mm for heavy duty yards. Thickness sets the mould cavity depth and the pressing stroke before it sets anything else, and it multiplies straight into the concrete volume per square metre. A 60 mm paver at 200 x 100 mm runs 21 to 24 pieces per mould on a QST6-15, and the same footprint on a static press at 31.5 MPa reaches 40 pieces on a QS1500.

Get a price on WhatsApp Or send a written enquiry

A paver block thickness standard is not one number in a catalogue. It is the first input that sizes the mould cavity, the pressing stroke, the concrete volume per square metre and the weight the crew lifts. Three grades cover almost all paving work: 60 mm for footpaths and courtyards, 80 mm for driveways and light vehicle traffic, and 100 mm for heavy duty yards. Move the thickness and the mould, the mix bill and the handling all move with it.

Thickness is often read as a strength grade, and it is not. Strength comes from the mix, the compaction pressure and the curing, which is why a 60 mm paver pressed at 31.5 MPa can beat a thicker unit that was badly compacted. Thickness answers a different question: how much concrete sits under the load, and how deep the cavity has to be to hold it.

Where Each Thickness Grade Belongs

Paving fails at the edge and at the joint before it fails in the middle, so the grade follows the load and the bedding rather than the colour. This is the table we use when a buyer sends a product list with no thickness.

Two notes sit under it. At 60 mm the face mix does most of the work, because the wear layer takes the traffic while the base carries it. And the step from 60 to 100 mm is not small: the same footprint holds two thirds more concrete, and every number downstream moves, from cement bags to pallet load.

ThicknessTypical useWhat it asks of the mould and press
60 mmFootpaths, courtyards, pedestrian plazas, garden pavingShallow cavity, short stroke, lowest concrete volume per square metre, easy on a 980 x 680 x 20 mm pallet
80 mmDriveways, parking bays, light vehicle traffic, residential roadsDeeper cavity, longer stroke, roughly a third more concrete per square metre than the 60 mm grade
100 mmHeavy duty yards, industrial floors, container handling areas, steep rampsDeep cavity, longest stroke, heaviest green unit, so stack height and clamp rating become the limit

Does thickness change the number of pieces per mould?

Not the way most buyers expect. On a fixed pallet the extra thickness makes the cavity deeper, not wider, so the plan arrangement stays put and the count often holds. The QST6-15 runs coloured floor tile at 200 x 100 x 60 mm in 21 to 24 pieces per mould on a 980 x 680 x 20 mm pallet, rated at 27,360 to 34,560 pieces per 8 hour shift. Deepen that cavity to 100 mm and the count holds, while the stroke and the fill grow.

Count changes when the moulding area changes. The static presses show it on the same 200 x 100 x 60 mm Holland brick: 16 per mould on the QS600 over 850 x 700 mm, 24 on the QS800 over 1,100 x 680 mm, 32 on the QS1000 over 1,100 x 850 mm and 40 on the QS1500 over 1,440 x 850 mm. Those numbers follow area, not thickness.

So thickness is the wrong lever for output per cycle. Where it bites is the mix that one cycle consumes: 21 cavities at 60 mm take a measured batch, and the same cavities at 100 mm ask the distributor for a larger fill. Buyers who want more pieces are buying moulding area. Buyers who want a thicker paver are buying depth, and depth is paid for in concrete.

How does thickness change cost per square metre?

Volume is area multiplied by thickness, and concrete is bought by volume. One square metre at 60 mm holds 0.06 cubic metres; at 80 mm it holds 0.08; at 100 mm it holds 0.10. Cement, sand and aggregate all scale with that figure, which is why a square metre price without a stated thickness is not a price.

The face mix scales as volume too, not as a coat of paint. A 100 mm paver that keeps its face layer at the same depth as a 60 mm one spends the same pigment per square metre. Keep the face as a share of total depth instead, and the pigment bill grows with the block. Pigment costs more per kilogram than cement or aggregate, so face depth is a cost line, not a cosmetic note.

Mould price follows the same variable. A deeper set needs more cavity machined out of the plate, a taller core, a longer pressing head and guide pins that stay aligned over a longer stroke. Steel is priced by weight, cavity work by hours on the CNC, heat treatment by the section and the batch. A quotation that lists one mould, 200 x 100 mm, has priced none of that.

Which machine presses a 60 mm face paver better?

Both families make the product, and the difference shows on the surface. A vibration press forms at 25 MPa with 68 kN of excitation force; the QST6-15 runs a 15 to 23 s cycle and draws 34.4 kW. A static press forms at 31.5 MPa, and the QS1500 carries 40 pavers per mould over 1,440 x 850 mm.

Two things follow. The higher pressure packs the face layer harder, which reads as a tighter surface and a sharper arris on a thin 60 mm section. And a static press holds depth against a fixed stop, so a 60 mm paver stays 60 mm across the pallet, which is what a laying crew needs.

Vibration earns its place when the product list is mixed. On the QST6-15 the same frame runs 390 x 190 x 190 mm hollow blocks at 6 per mould and pavers at 21 to 24, with a mould change inside a shift. On a single product paver order at 60 mm, the press wins on face quality.

Does thickness change curing and stacking?

It changes the weight on the pallet and the load on the clamp. A 100 mm unit leaves the mould heavier than a 60 mm one from the same cavity, so the forklift carries more per bite and the stack has to sit lower. The QS-1000G-A cuber clamps brick thicker than 50 mm and stacks to 1,300 mm, which sets the working envelope for a thin paver line.

Curing racks feel it as well. Thicker units hold water longer and need more time before cubing, so a 100 mm order either waits or takes more rack space. Size the yard on the thickest product in the catalogue, because the yard is built for the worst case the order book can produce.

Which six parameters must be fixed before the mould is ordered?

A mould order that arrives with a product name and nothing else comes back as questions, and each round costs a week. Five parameters close it.

  • Footprint and profile: 200 x 100 mm plus chamfer, spacer nibs and the exact plan shape.
  • Finished thickness: 60, 80 or 100 mm, written as the height you sell, not as an estimate.
  • Face layer depth: single layer or two layer, and how deep the face mix sits.
  • Pieces per mould and the row arrangement, which has to match the pallet.
  • Pallet size and plate thickness: 980 x 680 x 20 mm and 1,500 x 900 x 30 mm take different sets.
  • Machine model and moulding area: an 850 x 700 mm table and a 1,440 x 850 mm table share no tooling.

Which parameters should the enquiry carry?

Send the product list with footprint and thickness, the target output per shift, the pallet size you intend to run and the space available in the yard. Mould depth, cavity count and machine class follow from those four, so the reply comes back as numbers instead of a range.

Thickness is the one line that decides the rest, so state it first and state it as a finished height. Everything after it, cavity depth, stroke, mix volume, face cost, stack height and mould price, is a consequence.

Frequently asked questions

What paver thickness do I need for a driveway?

An 80 mm paver is the grade for driveways, parking bays and light vehicle traffic, while 60 mm stays on footpaths and courtyards. A driveway also needs a compacted base and edge restraint, because a paver spreads load into the bedding rather than carrying it alone. Move to 100 mm where axle loads are heavy or the surface takes container handling.

Does a thicker paver need a bigger machine?

Not always, but it needs a deeper mould and a longer stroke. On a fixed pallet the cavity count holds, so a 100 mm paver forms in the same 21 to 24 cavities as a 60 mm one on a QST6-15, with a larger fill each cycle. The forming pressure stays at the rated 25 MPa or 31.5 MPa; what grows is mix volume, mass on the pallet and curing time.

How much concrete does one square metre of 80 mm paving use?

Volume is area multiplied by thickness, so one square metre at 80 mm holds 0.08 cubic metres of concrete. At 60 mm it holds 0.06 and at 100 mm it holds 0.10. Cement, sand and aggregate scale with that figure, which is why two quotes per square metre can differ by a third before the mix design changes at all.

Why does a thicker paver cost more per square metre?

Every material in the mix is bought by volume, and volume is area times thickness. The face mix adds to that: pigment costs more per kilogram than cement or aggregate, so a thicker block carrying the same face ratio lifts the pigment bill. Mould cost rises too, from cavity depth, core height and heat treatment on the larger section.

Which thickness do static presses and vibration presses handle best?

Both handle 60 mm, and the choice rests on the product list. A QS1500 presses 40 Holland bricks of 200 x 100 x 60 mm per mould at 31.5 MPa, which gives a tight face on a thin section. A QST6-15 forms 21 to 24 at 25 MPa with 68 kN of vibration and switches to hollow blocks in the same frame.

Price guides
Machines that fit this
Machines used in this process

Want an engineering opinion on your project?

Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.

Talk to an engineer

Related reading

Request a quotation

A machine list, a layout drawing and a price, usually within one working day.

We reply within 12 hours. Your information is never shared.

WhatsApp Us