Payment terms for Middle East buyers: the paper that decides
26 October 2026 · 6 min read
Quick answer
Payment terms for Middle East buyers are decided by four proforma lines, then by whether the invoice, packing list and bill of lading repeat them word for word. The mould with its cavity count, the pallet size, the model with its supply voltage, and the scope of supply with spares must be exact before anything is signed. A mismatch in one of them holds a release; the payment method rarely does.
Payment terms for Middle East buyers are argued over the machine and settled by the paper. A proforma invoice that names the mould, the cavity count, the pallet, the model and the scope gives both sides something to point at when a crate is late. A vague one keeps the argument alive.
The chain is short. Proforma invoice first, then the contract with that invoice annexed, then the packing list, the commercial invoice and the bill of lading. Each document after the proforma carries fewer words, and the survivors are what a bank and a forwarder read.
Which four fields on a proforma invoice must be exact?
Four lines decide whether the order is the order, and each carries a number: a 390 by 190 by 190 mm hollow block, a 980 by 680 by 20 mm pallet, a model string, and a scope of supply listed item by item. Every one of those numbers is copied into later documents, so a mistake on the proforma is a fault that travels.
None of the four is a price term. They are the specification, and a schedule only works on a fixed specification. A buyer who fights over payment dates and leaves the cavity count as standard has bought an argument.
- Mould and cavity count. A QS1500 mould yields 40 pieces of 200 by 100 by 60 mm coloured floor tile in one cycle. Write the product dimensions, the cavity count and the mould number: output per cycle and price per piece both come from that figure.
- Pallet size. QST6-15 runs a 980 by 680 by 20 mm board and QT5-15 runs 1,100 by 650 by 20 mm. The mould is cut for one board. If the proforma says 980 by 680 and the packing list ships 1,100 by 650, the machine arrives with a mould that does not fit its pallets.
- Model string and supply. QT5-15 carries 37.4 kW installed, including a 2.25 kW feeding motor, and its electrical units are built for 380 V / 50 Hz. Copy the model as the nameplate reads it, then confirm your site supply in writing before the mould is cut.
- Scope of supply and spares. A mould ships as a matched set of frame, core, base plate, guiding assembly and positioning parts. List every item, then the spares you want in the same crate.
Why do the shipment documents have to agree with each other?
Three papers describe one shipment: the commercial invoice, the packing list and the bill of lading. Each is shorter than the one before, and the bill of lading is shortest, which is why it exposes a description nobody checked.
Compare four fields across the set: package count, gross weight, measurement and the model string. QST6-15 measures 9,450 by 3,300 by 2,700 mm and weighs 12 t, and those figures pass from the datasheet to the packing list to the bill of lading unchanged. Re-measure a crate and correct both papers, because papers that disagree read as one paper that is wrong.
The description is where forwarders cause damage. One clerk shortens the model, another writes spare parts for a mould set, and the invoice still carries the full string. Keep one description, taken from the proforma, on every document without editing. A bill of lading may summarise it, but it may not change what the goods are.
Are retention and warranty the same promise?
No, and writing them as one clause costs a buyer money. Retention is money you already owe and have not released. Warranty is an obligation the seller carries after the money is gone. Different triggers, different evidence, different endings.
Retention releases on an event you can watch: commissioning on your aggregate and cement, a stack of blocks standing at the strength check, an operator changing a mould without help. Write the amount in the invoice currency and name the event, the evidence and the signature that releases it. An amount stays stable, while a percentage moves with the order and both sides then argue about the base.
Warranty starts on a date and covers repair. If the clock starts at the port and commissioning comes later, part of the cover is spent before the first saleable block. Start it at the commissioning sign-off, list exclusions plainly, wear parts, mould damage from tramp metal, water ingress, and name who pays freight on parts. A warranty silent on freight stalls at the first claim.
Who carries the bank charges at each end?
Charges appear at three points: the bank that sends the transfer, the bank in the middle and the bank that receives it. Each deducts before the money lands. If the proforma is silent, the deduction comes out of the amount that arrives and the invoice stays open by exactly those charges.
Settle it in one sentence. Charges at the buyer's end for the buyer, charges at the seller's end for the seller, and the middle bank's charge assigned to one side by name.
Currency is the other half. The invoice currency, the currency in the payment instruction and the currency of any credit must be one code. Where two appear, somebody converts at a rate nobody agreed and the loser is whoever holds the invoice. State the amount in figures and words in that currency, and keep charges outside the invoice value so retention is calculated on a clean number.
What should a buyer photograph before the crates are closed?
An inspection right is worth having only when it is written with a stage and a notice period. Put it after the trial, where a QST6-15 runs a 15 to 23 second cycle, and before the crates are closed, while a correction is still a workshop job.
If you cannot travel, ask for dated images and one wide shot holding the machine and a clock, with the set annexed to the packing list, so the papers and the steel agree before the container is sealed.
- The trial. The machine running your block at the cycle written in the order, filmed across several complete cycles, not one.
- The product. A caliper on three pieces, length, width and height, with the reading inside the frame. One piece proves nothing.
- The mould. The cavity count on the plate, shot straight on, and the mould number in the same frame.
- The nameplate. Model string and installed capacity together, 37.4 kW on a QT5-15, so the crate in the photograph can be tied to the invoice line.
- The crates. Every number against the packing list, counted inside the photograph, and damaged corners shown rather than cropped.
What goes in the contract so a disagreement can be decided?
Four clauses carry most of the weight: precedence, inspection, remedy and notice. Each decides a fight that would otherwise be settled by whoever is louder.
Precedence names the order, contract first, proforma annex second, packing list third, so a conflict resolves without a meeting. Inspection fixes the window after arrival and what silence at its end means. Remedy gives a ladder, replacement part, credit, rejection, with a trigger for each step measured from a document date. Notice names an address and the one governing language.
- The proforma invoice, annexed, carrying the mould number and the cavity count.
- The inspection stage, the notice period and the photographs required.
- The retention amount, its release event and the signature that releases it.
- The warranty start event, the exclusions and who pays freight on parts.
- The bank charge allocation and the single invoice currency.
Frequently asked questions
What must a proforma invoice state for a block machine order?
Four lines carry the order: the mould with its product dimensions and cavity count, the pallet size, the model string with the supply it is built for, and the scope of supply with spares. Add the currency and the charges clause. Everything after that, the packing list, the invoice and the bill of lading, is a shorter copy of those lines.
Why do mismatched shipment documents hold up a release?
Because the payer reads the set as one description of one shipment. When the invoice says QST6-15 and the bill of lading says block machine parts, or the package count differs from the packing list, nobody can confirm that the paper and the crate are the same goods. The set goes back for correction and the machine waits.
Should retention and warranty sit in one clause?
No. Retention is an amount withheld and released on an event you can witness, such as commissioning on your own materials. Warranty is a repair obligation that starts on a stated date and runs for a stated period. One clause covering both leaves the release event undefined, and the withheld amount then waits on an argument instead of a signature.
Which side pays the bank charges on a transfer?
Whichever side the contract names. Write it as one sentence: charges at the buyer's end for the buyer, charges at the seller's end for the seller, and the middle bank's charge assigned to one of them by name. If the proforma is silent, the charges are deducted from the amount sent and the invoice stays open by that difference.
How do I inspect a block machine before shipment?
Ask for the mould trial on your block at the cycle in the order, a caliper on three pieces with the reading visible, the cavity count on the mould plate, the nameplate beside the model string, and every crate number counted against the packing list. Have the images annexed to the packing list so the papers match the steel.