Quick answer
One large press and two smaller ones can serve the same order book, and the arithmetic is closer than most buyers expect. One QST1800 forms 1.96 square metres of pallet area per stroke at 104 kW and 34 t. One QST1200 forms 1.188 square metres at 57.6 kW and 17 t, so two of them form 2.376 at 115.2 kW. Two presses give about 21 percent more forming area per cycle for 11 kW more installed power, but they need two bays, two crews, two mould sets per product and twice the changeover time. One press gives one lift and half the part count, and the plant stops when it stops.
The question arrives after the output target is set: one big machine, or two smaller ones that add up to the same production. The two answers are different plants with different buildings, crews and risks, and the difference does not show in the press price.
This page compares one QST1800 against two QST1200 and two QST1500, using the published specification tables. The layouts are not ranked. What is ranked is the arithmetic, and the costs outside the press line.
Forming area per stroke is the comparison that holds
Tonnage and model numbers invite the wrong comparison. The pallet does not. A 1,400 by 1,400 mm board carries 1.96 square metres, a 1,350 by 880 mm board carries 1.188. Every cycle in the range sits between 15 and 25 seconds, so strokes per shift are similar and the area formed per stroke separates the layouts.
Two presses also give two separate forming events, which matters when a different product runs on each. The single press forms one product at a time, so a mixed order book is served by changeovers.
| Layout | Installed power | Forming area per cycle | Vibration force | Pallet | Machine mass |
|---|---|---|---|---|---|
| One QST1800 | 104 kW | 1.96 m2 | 280 kN | 1,400 x 1,400 x 30 mm | 34 t |
| Two QST1200 | 115.2 kW | 2.376 m2 | 150 kN each | 1,350 x 880 x 25 mm | 17 t each |
| Two QST1500 | 138.2 kW | 3.105 m2 | 220 kN each | 1,350 x 1,150 x 30 mm | 20 t each |
What the second press costs beyond its own price
The press line is the smallest part of the difference. Each machine needs its own feeder and stacker, its own feed and breaker, its own foundation and lift plan, and a crew. The pallet fleet does not double, because it follows output rather than machine count, and neither does the curing area. What doubles is the number of places where a jam or a wear part stops production.
Moulds are the line buyers miss. One set makes one product at one size on one machine, so two presses running the same product need two sets, and a range of four sizes means eight sets instead of four. That is capital standing on a rack, and it must be counted before the second press looks cheaper.
Redundancy is a production argument, not a price argument
With one press, a failed hydraulic seal or a burnt contactor means zero output until the part arrives. With two, half the output continues and the repair happens in working hours rather than in a race with a delivery date. On tender supply, where a late batch carries a penalty, that is worth more than the price gap.
The other side is part count. One QST1800 has one hydraulic unit, one controller and one crew to train. Two presses double the things that can be maintained wrongly, and a plant that cannot staff two shifts will run two machines badly rather than one well.
The building decides before the accountant does
A QST1800 stands in 15,500 by 5,500 by 3,200 mm and weighs 34 t. Two QST1200 presses stand in two bays of 11,500 by 4,550 by 2,800 mm with a forklift lane between them and clearance for the stacker behind each. The crane differs too: 34 t in one lift against 17 t twice, and the load per support point is a figure for the structural engineer either way.
Where land is available and the hall is not built, the comparison can flip. One tall machine on a single slab, with one curing chain behind it, can cost less in civil works than two long bays with two crane runs and a lane between them.
Power and starting: two presses start one after the other
A QST1800 asks for 104 kW installed and one large start. Two QST1200 presses ask for 115.2 kW in total, in two steps of 57.6 kW, and the second can start once the first is running. On a supply that will not carry a 104 kW start without a deep dip, that sequencing can save a transformer size.
The saving is not automatic. Two feeds mean two breakers, two cable runs and two protection settings, and the panel work grows with them. Weigh one against the other on site numbers.
When two presses are the better answer
Five situations repeat in our enquiries, and in each of them the second press is bought for a reason that has nothing to do with the press.
- Capital arrives in stages: the first press runs and earns while the second is ordered from production, not from savings.
- Two products run at the same time, a hollow block line and a paver line, without a changeover between them.
- The supply will not carry a 104 kW start in one step but will carry two 57.6 kW starts in sequence.
- Two halls already exist, each with its own slab, crane and door, and neither can take a 34 t machine.
- Delivery dates carry penalties that a single point of failure cannot survive.
When the single large press is the better answer
The reverse list is shorter and just as real. One product mix with few sizes, one crew, one curing chain and one cuber favour the single machine, because every extra press multiplies supervision without adding a product. High density pavers that need the 280 kN and the 1,400 by 1,400 mm pallet point the same way, since the smaller presses top out at 150 kN on a 1,350 by 880 mm board.
A site with clear height for a 3,200 mm machine, a wide enough door and a crane rated for 34 t should not build two bays to avoid one lift. The infrastructure is already paid for.
Send the product mix with cavity counts, the target output per shift, the bay dimensions and clear height you have, the installed power the supply allows, and the date a second stage would be ordered. We will confirm which of the three layouts the figures support and what each needs in foundation, crane capacity and panel.
Want an engineering opinion on your project?