What Is the Warranty for a Block Making Machine

4 November 2026 · 5 min read

Quick answer

The warranty for a block making machine is not one figure. It is a written split of the machine into three groups, frame and structure, hydraulic circuit, and electrical control, each with its own period and proof standard. A claim is settled with the shift log, gauge readings against the class rating of 25 MPa or 31.5 MPa, an oil sample and photographs of the failed part. The clock should start at commissioning acceptance, not at shipment.

Get a price on WhatsApp Or send a written enquiry

What is the warranty for a block making machine? It is a written document that splits the machine into parts with different failure modes, then fixes a period and a proof standard for each. Buyers who read the period and skip the proof are the ones arguing about a failed seal with nothing but a memory of the machine stopping.

The split in a serious contract is always the same three groups: structural and frame, hydraulic circuit, electrical and control. Each fails for its own reason, at its own age, and each needs different evidence. A supplier who answers with one figure has not answered at all.

How does the warranty split the machine into three parts?

The structural group covers the main frame, the columns, the mould guide beams and the tamper mounting. A QST6-15 moves 12 t of machine mass through a forming cycle of 15 to 23 s, and the frame carrying the tamper absorbs that load thousands of times a shift. Cracks at a weld toe and a bowed guide beam belong here. A failed column bolt counts only if the torque record shows it was kept. A crack beside a dry grease nipple is maintenance, not warranty.

The hydraulic group covers the pump, the valve block, the main cylinder, the hoses and the cooler. It stops more plants than the other two, and it is the easiest group to argue, because pressure is a number. Machines in the QST6-15 class are rated at 25 MPa, while the QST8-15 and the QS static presses run at 31.5 MPa. A circuit that cannot hold its rated number is worn, set wrong, or both.

The electrical and control group covers the PLC, the contactors, the sensors, the wiring and the screen. Few claims here are true component failures. Most are water inside a cabinet, dust packed into a connector, or a sensor pushed out of position by a pallet that never seated. Read the site-condition exclusions first.

  • Structural: frame, columns, guide beams, welds. A claim needs a crack photograph and the load history.
  • Hydraulic: pump, valve block, cylinder, hoses. A claim needs a pressure record, not a description of the noise.
  • Electrical: PLC, sensors, wiring, screen. A claim needs the alarm log and the condition inside the cabinet.

Why does the date the clock starts matter more than its length?

A warranty that starts on the shipment date is shorter than it looks. The machine spends weeks in transit, then more weeks on a foundation and a crew still learning the panel. Ask for the clock to start at commissioning acceptance, signed by both sides on the day the line completes its test run, not on the bill of lading.

That acceptance sheet should carry numbers. Record the pressure each circuit reaches against its class rating, and the cycle time measured with a stopwatch: 15 to 23 s on the QST6-15, 20 to 25 s on the QS600 static press. Record the first saleable pallet, which on the QST6-15 means 6 hollow blocks per mould at 390 x 190 x 190 mm, and on the QS600 means 16 pieces per mould for a 200 x 100 x 60 mm paver. A sheet without numbers leaves the warranty without a baseline.

How is a claim proved when the machine stops?

Three records settle most claims: the shift log, the pressure record and the oil sample. Together they answer the only question a supplier really asks, whether the part failed inside its duty or outside it.

Pressure is the strongest of the three because it is measured rather than described. Bring the ram down on a closed mould, raise the gauge to the class rating, stop the pump and watch. A circuit that holds 25 MPa on a QST6-15, or 31.5 MPa on a QST8-15, for the set hold time is sound. One that falls away slowly is passing oil. If the gauge drops while the ram stands still, the piston seal is the suspect. If it drops with a hiss at the valve block, the relief valve seat is returning oil to the tank. Send the gauge face, the hold time and the reading, and a wear claim separates from a setting error without a site visit.

The shift log proves the machine ran inside its limits, so note the product, the mix, the cycle count and every alarm in the same format each shift. Draw the oil sample hot from the return line into a clean jar and keep the lab report in the machine file. Photograph the failed part before anyone wipes it: a seal shot in place, with the oil trail visible, tells an engineer more than a seal in a bag.

Why are moulds and pallets left outside the warranty?

Moulds and pallets are wear parts. Production consumes them rather than a fault breaking them, and every manufacturer places them outside coverage for the same reason: their life depends on the mix, the operator and the pallet fleet. That is not a trick buried in the clause.

A mould wears at its leading edge, because that edge meets the pallet on every cycle, and a pallet bows long before it cracks. The QST6-15 runs a 980 x 680 x 20 mm pallet, and every bowed board loads the mould edge instead of the concrete. Check flatness across both diagonals each week and pull the boards that rock. That habit decides whether a mould lasts a season or a year.

Put wear parts in the running budget from the first month, and ask for the mould and pallet specification in writing with the quotation. A mould built for a dry mix will not survive a wet one.

What should the written clause contain before you sign?

Ask for the terms in writing before the deposit, and read them as a specification rather than a promise. Six items carry the weight.

  • The parts list: which component sits in each of the three groups, named rather than described as the hydraulic system.
  • The start date: commissioning acceptance, with the signed sheet and its readings attached as an appendix.
  • The proof standard: what evidence a claim needs, and who pays for the inspection when a finding is contested.
  • The exclusions: wear parts, consumables, water and feed quality, overload, and any repair done outside the approved procedure.
  • The remedy: repair, replacement or credit, and whether labour and travel sit inside or outside it.
  • The parts commitment: the list held for your model, and the lead time stated in weeks.

Why do spare parts decide downtime more than the clause does?

A warranty pays for a part. It does not pay for the shift the plant did not run. The distance between a failure and a working machine is a shipping lane and an import file, and no clause shortens either.

That is why the spare parts list matters more than the wording: a seal kit for the bore you run, a filter element, a full hose set, the two sensors that stop the cycle, and a second mould for your best seller. The QS600 runs a 450 mm main cylinder bore, so a kit bought for another bore is a shelf ornament.

A QST6-15 pushes 34.4 kW of installed power through a cycle of 15 to 23 s, so a stopped machine is a queue of pallets. Ask which items ship from stock and which are made to order, and put that answer in the same document as the warranty.

Frequently asked questions

What should a block machine warranty actually cover?

It should cover three groups by name: the frame and structural steel, the hydraulic circuit from pump to cylinder, and the electrical and control system. A useful clause also fixes the start date, the evidence a claim needs and the remedy offered. On a machine rated at 25 MPa, a hydraulic claim is settled by a hold test against that figure, not by a description of the noise it made.

Does the warranty start on the shipment date?

It should not, and a buyer can ask for better. Transit and site preparation consume time the plant never gets back, and a clock running from the bill of lading is partly spent before the first block. Ask for commissioning acceptance as the start point, signed on the day the line completes its test run, with the pressure readings and a timed cycle, 15 to 23 s on the QST6-15, written on the sheet.

Are moulds and pallets covered by a block machine warranty?

No, and that is normal practice. Moulds and pallets are wear parts, consumed by production rather than broken by a fault, and their life depends on the mix, the operator and pallet flatness. Budget them as a running cost. On the QST6-15, a 980 x 680 x 20 mm pallet that has bowed will wear the mould edge faster than any other single cause.

How do I prove a hydraulic fault under warranty?

With a pressure record. Close the mould, bring the ram down, raise the gauge to the class figure, stop the pump and time how long it holds. A circuit that falls away from 25 MPa on a QST6-15, or from 31.5 MPa on a QST8-15, is passing oil. Add the shift log, a hot oil sample and a photograph of the part still in place.

Why does spare parts availability matter more than warranty length?

Because a warranty replaces a part, not the shifts lost waiting for it. The clause ends at the invoice, while a missing seal kit stops the plant for as long as the freight takes. Ask which parts are held for your model, keep a seal kit, a filter, a hose set and the two cycle sensors on your shelf, and buy a second mould for your best-selling product.

Price guides
Machines that fit this
Machines used in this process

Want an engineering opinion on your project?

Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.

Talk to an engineer

Related reading

Request a quotation

A machine list, a layout drawing and a price, usually within one working day.

We reply within 12 hours. Your information is never shared.

WhatsApp Us