Settle the block standard first, then the pallet, then the cavity count. A mould set is a matched assembly of frame, core, base plate, guiding assembly and positioning mechanism, cut for one machine and one pallet: 980 x 680 x 20 mm on the QST6-15, 1,400 x 1,400 x 30 mm on the QST1800. Cavity count follows forming area and fill, from 6 hollow blocks to 32 to 36 standard bricks per mould. Treat wear as a consumable and budget the second set as capital.

Get a price on WhatsApp Or send a written enquiry

How to choose block machine moulds starts at the machine interface, not at the shape of the block. A set is a matched assembly: frame, core, base plate, guiding assembly and positioning mechanism, cut from wear-resistant alloy steel, machined on CNC to micron level and hardened as one unit. Four decisions settle it: the block standard the market buys, the pallet the set seats on, the cavity count the press can fill evenly, and the wear life you plan around.

A mould set is an assembly, not a shape

The frame carries the clamping load and holds the cavity block square. The core forms the voids and touches green concrete on every cycle. The base plate is the pressing face and the seat on the pallet. The guiding assembly keeps the punch parallel, and the positioning mechanism returns the set after a change. The five parts ship as one matched set: a frame will not accept another set's core, because the fit is machined, not bolted to a tolerance.

Which block standard does the market buy?

Start with the block that pays the yard. A 390 x 190 x 190 mm hollow block, a 240 x 115 x 51 mm standard brick and a 200 x 100 x 60 mm paver are profiles with settled cavity layouts: core spacing, fill path and release angle are already solved for the machine. One QST6-15 mould gives 6 hollow blocks, 15 porous bricks of 240 x 115 x 90 mm, 32 to 36 standard bricks or 21 to 24 floor tiles.

A custom profile is a different job. Wall thickness, arris radius, chamfer and core shape decide how the set is machined and how the block releases. Order custom when a buyer has signed for repeat volume and can hand over a dimensioned drawing.

Is the pallet part of the mould?

Yes, in the only sense that matters: the two are one system. The base plate seats on the pallet face, the guiding assembly positions the frame against the pallet datum, and stack height at closing depends on pallet thickness. Pallets run 980 x 680 x 20 mm on the QST6-15, 980 x 860 x 22 mm on the QST8-15, 1,350 x 880 x 25 mm on the QST1200, 1,400 x 1,400 x 30 mm on the QST1800 and 900 x 700 x 20 mm on the QS600 press.

A plant with two machine models needs two families of sets, since a base plate cut for a 980 mm pallet cannot be re-seated on a 1,350 mm one. A 30 mm pallet also lifts the clamping stack 10 mm above a 20 mm pallet.

How many cavities can the press fill evenly?

Cavity count is argued as output and it is really a fill problem. Every cavity needs the full block footprint plus a steel wall, so the count follows the forming area: a 390 x 190 x 190 mm hollow block runs 5, 10 and 12 per mould and a 240 x 115 x 51 mm standard brick 28, 45 and 87 on the double-direction presses, from 1,100 x 680 mm to 1,440 x 850 mm.

Then the fill. A distributor has to reach the last pocket inside the fill window, and a wide pallet with a long feed stroke is where weak corners appear. The porous brick at 15 per mould on the QST6-15 leans on an arch-breaking distributor, and the 32 to 36 band for standard brick is the honest width of a layout that can be arranged either way. More cavities also mean a heavier set and a slower change.

Run the arithmetic. A 36 cavity set on a 15 second cycle completes four cycles a minute, which is 144 pieces; at 22 seconds the same set gives about 98.

Where the wear is written into the order

A mould is a consumable with a limited number of strokes, and the order sheet decides how many. The core flank does the hard work: it drags across green concrete on every release, so a rough flank raises the vibration needed to release the block, and that setting costs cycle time and wear. Heat treatment is what buys strokes, and it is worth asking for in writing at the core and at the pressing face.

Replaceability is the second item. If cores change without re-cutting the frame, the set has a second life at the cost of a core set. If the frame goes back for a re-cut, the plant is buying a new set.

What should you check on a mould offer before you sign?

An offer can hit the right dimensions and still be wrong for the plant. Five checks take an afternoon, and each produces a number rather than an opinion.

  • Put a straight edge across the base plate and photograph the gap, then ask what deflection the supplier expects under 31.5 MPa with the set clamped.
  • Ask for the cavity layout drawing with the pallet datum marked, and measure the steel left between the outer cavity and the frame edge.
  • Take 50 blocks from a set already working nearby and measure height across the cavities; a block that rocks in a stack points to the base plate.
  • Weigh the set against the hoist or the two men who change it; a wide set on a small machine is a changeover cost paid every season.
  • Confirm which parts ship as wear items, and whether the frame can be re-machined without losing the cavity spacing.

How the mould decision moves the machine class and the total

The mould is a recurring line in the budget, and it is also the line that decides the machine. Pallet size and cavity count set the forming area and the clamping load: a 1,400 x 1,400 mm pallet at 30 mm sits on a 34 t machine with 280 kN of vibration force, a 980 x 680 mm pallet at 20 mm on 12 t and 68 kN. A larger block standard later means a new machine, not a new mould.

Start with one set per product that ships weekly, and read the second set as a scheduling decision rather than a spare. Put the second set of the biggest mover in the capital plan on day one. A press stopped for a core change also stops the mixer, the pallet feeder on its 13 second cycle and the crew behind it, so that set turns an unplanned stop into a planned one. The third set carries a product that has not proved its volume.

It moves the blocks a quotation is built from: host machine class, mould sets, the mixer and batcher sized to the batch per stroke, the pallet fleet at the size you picked, curing floor, and the cuber running 15 to 18 seconds per layer. Freight and commissioning follow the weight of the set.

Settle the four decisions in the order they bind: block standard, then pallet, then cavity count, then wear. A drawing that names the pallet, the machine and the cavity layout is the difference between a set that runs on the first shift and one that is adjusted for weeks.

Frequently asked questions

What is the difference between a mould set and a mould frame?

The frame is one of five parts. A complete set is the frame, the core, the base plate, the guiding assembly and the positioning mechanism, machined to work together on one machine and one pallet. Buy a frame alone and you still need cores cut for the cavity layout, a base plate matched to your pallet thickness and a guiding assembly that keeps the punch square.

Does one mould set fit more than one machine model?

Rarely. The set is cut against the forming area, the clamping points and the pallet of one machine. A QST6-15 forms on a 980 x 680 mm pallet and a QST1800 on 1,400 x 1,400 mm, so base plate, frame width and cavity layout differ. A second machine model means a second family of sets, including the profiles you already own for the first.

How do I know whether a cavity layout will fill evenly?

Ask for the layout drawing with the feed path marked, then weigh green blocks from the first, a middle and the last cavity across one pallet. A spread of more than a few percent says the distributor cannot reach the far pocket inside the fill window. The 32 to 36 band on a QST6-15 standard brick mould is what such a layout looks like on paper.

Should the second set be the same profile as the first?

Usually yes when one block fills most of the shift, because a duplicate keeps the press forming while the working set is serviced or re-cored. It stops being a duplicate when a kerb stone or a paver sells alongside the block to the same customer: then the second set is a second product. The volume test decides.

How does the mould choice change the machine price?

Through the pallet and the cavity count. A 1,400 x 1,400 mm pallet at 30 mm sets a forming area that needs a 34 t machine and 280 kN of vibration force, while a 980 x 680 mm pallet at 20 mm runs on 12 t and 68 kN. The mould itself is quoted per set, as a recurring line for each product and its wear life.

Price guides
Machines that fit this

Want an engineering opinion on your project?

Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.

Talk to an engineer

Related reading

Request a quotation

A machine list, a layout drawing and a price, usually within one working day.

We reply within 12 hours. Your information is never shared.

WhatsApp Us