QS cantilever wrapping machine price: film and footprint
26 October 2026 · 6 min read
Quick answer
The QS cantilever wrapping machine price follows the pack. Arm radius and lifting stroke come from the stack footprint, which runs 1,000 to 1,200 mm square, and from pack height, which reaches 12 layers of solid brick. Then film carriage with pre-stretch, top film for a five-sided pack, PLC control, and a cycle matched to the cuber. Describe the pack badly and the cheapest offer is the wrong machine.
The QS cantilever wrapping machine price is set by the pack, not by the machine. A wrapper is a frame, an arm, a film carriage and a control cabinet. Almost all of the cost difference between two offers comes from how far the arm must reach, how high it must lift, how much film it must lay and how fast it must cycle. Two plants can order the same model and receive two different machines.
So a quotation starts with five answers from the buyer: pack footprint, pack height and weight, packs per shift, film type, and the position of the wrapper in the line. Give those and the machine configures itself. Leave them out and the supplier quotes the smallest standard build, which is where most arguments about this machine begin.
How does the pack footprint set the wrap geometry?
A cuber builds a square stack of 1,000 to 1,200 mm before the wrapper receives it, and solid brick stacks up to 12 layers. That square is the geometry the arm travels around. The arm rotates at a fixed radius and the film carriage rides on it, so the carriage must clear the corner of the widest pack you will ever build. A pack wider than the design point fouls the film path on every revolution.
Height carries as much weight as footprint. Stretch film goes on as a helix, so the revolutions needed to close one pack follow pack height divided by film width, and the lifting stroke of the arm has to cover that height. A top rotary baler in this range is rated for a packing height of 1.0 to 1.5 m, so the pack you plan is measured against both machines, not one.
Why does the arm turn instead of the pack?
On a turntable wrapper the load rotates and the film mast stands still. That suits a light, stable, dry pallet of cartons. A wet concrete pack is none of those three things. It is heavy, its layers are still green, and rotating it puts a torque through the stack that the bottom layer has to resist alone. The cantilever layout inverts the arrangement: the base is fixed and the arm orbits the pallet.
The consequence is mechanical. With the pallet standing still the centre of gravity never moves, so a tall stack of aerated concrete blocks, cement bricks or gypsum blocks can be wrapped without the toppling and scattering that a rotating table invites. That is why the base stays fixed and compact, and why the machine holds up under dust and heavy continuous duty at the end of a building materials line.
What does the film cost per pack, and where does it go?
Two films can leave the same wrapper. Stretch film wound helically closes the four sides and the top edge. A top film, laid over the stack and joined to the stretch film, closes the fifth face, so the pack is sealed on five sides and comes out moisture-proof, rain-proof and dust-proof. The cantilever machine does both in one pass, and that is the difference between a pack that sheds water on sea freight and one that drinks it inside the container.
Film is a running cost and it recurs every shift, so price it per pack rather than per machine. Pre-stretch built into the film carriage stretches the film before it reaches the pack, which raises film utilisation and lowers consumable cost for the same holding force. After that, the layers, the tension and the overlap stored in the touch screen set consumption. One extra layer on every pack, all shift, is a cost that no quotation shows.
Does the wrap cycle keep up with the cuber?
A wrapper slower than the cuber becomes the bottleneck, and the whole line then runs at the wrapper's rate. The cuber side is measurable. A simple cuber system runs about 16 s per layer for roughly 2,000 pallets per shift, the double-station version about 13 s per layer for roughly 3,800 pallets per shift, and a mobile yard cuber about 1,300 pallets per day. The wrapper has to absorb that flow with no queue in front of it.
If the pack is also strapped, the baler joins the arithmetic. A translation baler takes about 15 s for a 1.2 m3 pack, with strap fed at 3 m/s and tensioning near 160 mm/s, and it is light to install at about 800 kg and 2 kW. A top rotary head takes 15 to 18 seconds per strap, with tension set from 200 to 2,500 N inside a 2,000 mm frame travel.
Run wrapping and strapping in series and the two cycle times add. The slower unit then sets the pace of the packing station, whatever the faster one can do on paper. Buy the wrapper on the pack you will really wrap and the rate your cuber holds, not on a feature list.
What does a cheap offer leave out?
A stripped offer keeps the frame and the arm and removes what sits around them. The film carriage without pre-stretch is the first casualty: it burns more film for the same holding force, so the saving on the quotation is repaid pack after pack. The second is the top film unit, and without it the pack closes on four sides only, which is enough in the yard and not enough in a container.
Then the control. PLC with a touch screen gives automatic film feeding, wrapping and cutting, one-touch start, and stored settings for wrapping layers, lifting stroke and film tension. A relay panel with two timers does none of that, so every product change becomes a manual reset. Ask for the wear list as well: the rollers the film runs over, the cutting blade and the arm drive are what stop a wrapper.
Downtime is where the missing parts collect their cost. The wrapper sits last in the line, so when a film roller seizes or the blade tears the film, every pack behind it waits and the cuber stops with them. Ask what the arm drive, the carriage rollers and the cutting blade cost to replace, and whether they are standard stock items or made for this model. A supplier who answers that in writing is quoting a machine you can keep running.
What must you send for an accurate quotation?
Five inputs turn a price into a quotation you can compare. Without them every offer on your desk is for a different machine, and the lowest one is usually the smallest.
- Pack footprint and pack height in millimetres, measured on the stack your cuber actually builds, not taken from a brochure picture.
- Pack weight, because a wet aerated stack and a dry kerb stack load the base and the arm drive differently.
- Packs per shift and the shift pattern, so the wrap cycle is checked against your cuber and your baler, not against a catalogue figure.
- Film type and roll width: stretch film alone, or stretch film plus top film for a five-sided closed pack, in widths you can buy locally.
- Line layout and power supply: where the wrapper sits, the free space beside the standard 6 m discharge conveyor that feeds it, and your site voltage. The balers in this range are listed at 380 V / 50 Hz, so a different supply changes the control panel.
Frequently asked questions
What decides the price of a cantilever wrapping machine?
The pack decides it. Arm radius and lifting stroke follow the widest and tallest stack you will wrap, and a cuber stack runs 1,000 to 1,200 mm square with solid brick up to 12 layers. Then come the film carriage with pre-stretch, the top film unit, PLC control with stored settings, and a cycle speed matched to the cuber feeding it.
Why use a cantilever wrapper instead of a turntable for block packs?
A turntable turns the load, and a wet block pack cannot take that. Its layers are still green, the pack is heavy, and rotation puts a torque through the stack that the bottom layer resists alone, so corners spall and stacks lean. In a cantilever machine the pallet stands still and the arm orbits it, so the centre of gravity never moves and a 12-layer stack wraps safely.
How much stretch film does one pack consume?
Consumption follows geometry and settings, not a fixed figure. Revolutions per pack equal pack height divided by film width, and each revolution lays film around the pack perimeter. Multiply by layers and overlap, then divide by the pre-stretch ratio of the carriage. Ask the supplier for film width, pre-stretch ratio and standard layer count in writing, then weigh a roll before and after a shift.
Can the machine close the top of the pack as well as the sides?
Yes, when it is ordered with the top film unit. Stretch film alone closes four sides and the top edge. A top film laid over the stack and joined to the stretch film closes the fifth face, so the pack is sealed on five sides against moisture, rain and dust. That is the configuration to specify for sea freight, and it is an option on the same frame.
Which details must I give before a wrapping machine is quoted?
Pack footprint and height in millimetres, pack weight, packs per shift, film type and roll width, line layout, and site voltage. Add the product mix, because aerated block, cement brick and gypsum block wrap differently, and the baler you plan to run in series. With those, arm radius, lifting stroke, film carriage and cycle time can be fixed and compared offer to offer.
Want an engineering opinion on your project?
Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.