QS1500 hydraulic brick press price: what drives it
25 October 2026 · 6 min read
Quick answer
QS1500 hydraulic brick press price is built from five cost blocks in a fixed order: frame and platens, the 31.5 MPa hydraulic package, the mould set, control and safety, then export and freight. Frame and hydraulics carry the most. One badge covers an 18 to 22 second double-direction press and a 20 to 25 second single-direction press, so the specification sets the number, not the model name.
A QS1500 hydraulic brick press price is five cost blocks stacked in a fixed order, and the order matters more than the total. From the largest down: the frame and platens, the hydraulic package, the mould set, the control and safety package, then export and freight. Two quotations for the same model can differ widely and both be honest, because they were built from different versions of those five.
The press works by static pressure. Hydraulic rams compact the mix in a closed mould with no high frequency vibration in the forming stroke, so density comes from pressure and dwell. That one design choice explains why the frame, the cylinder and the pump carry most of the price: they are the parts that hold 31.5 MPa and repeat it thousands of times a shift.
What are the five blocks inside a QS1500 hydraulic brick press price?
The frame and platens come first because they are steel by the tonne and they are machined after welding. The body is welded and stress relieved, then aged so it does not walk out of alignment under continuous pressure. A stress relief cycle costs furnace time and adds weeks to delivery, and it is the first line a cheap offer deletes.
The hydraulic package is second and usually the heaviest block. Working pressure is 31.5 MPa across the range, and the main cylinder bore runs from Ø500 mm to Ø720 mm depending on the model and the force the mould needs. Inside the package sit the cylinder, the rods, the proportional valves, the pump and the oil. Genuine valves and a matched pump are most of it.
The mould set is third and is quoted as its own line item, for reasons the next section takes apart. The control and safety package is fourth: the PLC, the touch screen, the position sensors, the guards and the interlock that stops the ram when a gate opens. Export packing, cradle, rust prevention, documents and freight make the fifth.
Why the same QS1500 has several price points
The name QS1500 fixes the moulding area, not the specification. The double-direction version presses from above and below at once on an 18 to 22 second cycle, runs pallet free, and covers a moulding area up to 1,440 x 850 mm. The single-direction version in the same family runs a 20 to 25 second cycle. One badge, two machines, two prices.
Cycle time decides the shift, so read it before any other number. Both versions carry the full cavity count on every stroke, which means a press at 18 to 22 seconds and a press at 20 to 25 seconds deliver different piece counts in the same 8 hours from an identical mould. That difference is the machine, not the salesman.
Pallet-free operation shifts the price in two directions. It removes the pallet fleet, the pallet return system and pallet maintenance, a real saving for a plant that would otherwise buy and repair boards for years. It also moves the whole handling duty to the take-off side, where wet blocks must be grouped and lifted off the platen.
Only three options change output per shift: cavity count in the mould, cycle time, and pallet-free against pallet operation. The rest, from extra guard panels to a larger oil tank, buys comfort or service life and not one block. Sort the quotation that way before comparing totals.
Is the mould a consumable or a free accessory?
A mould set is a consumable line item, not an accessory added to close a deal. It is a matched assembly: frame, cores, base plate, guiding assembly and positioning mechanism, cut from wear resistant alloy steel, machined by CNC to micron tolerance and heat treated. Every cycle wears the cavity walls, and the day blocks leave with soft corners and a heavy flash line, the set is due.
Re-cutting a set is machine time, not a discount. The worn faces are built up, machined back and heat treated again, and the set returns to the press with cavity dimensions restored. A factory selling three products needs three sets on rotation plus a spare of the fastest wearing product, because a change with no spare on the shelf costs a shift.
The drawing is signed off before the frame is cut because the mould defines the machine. Cavity layout sets the platen size, the stroke, the ejection height and the guard opening. One mould for a 200 x 100 x 60 mm coloured floor tile carries 40 pieces on a QS1500, and those 40 pieces decide the platen and the force.
What makes a cheap QS1500 offer cheap?
A thinner frame is where cost leaves first. Steel is bought by weight, so a body welded from lighter plate and aged for fewer hours saves money at the works and spends it in your plant, where the frame deflects, the guides wear unevenly and block thickness drifts from one side of the mould to the other.
Non-genuine hydraulic parts come second. A copied proportional valve looks the same from outside and behaves differently after a year at 31.5 MPa: sticking spools, pressure spikes, a pump replaced before its time. A mould cut from a softer plate is third, and it is the easiest to hide, because a soft mould makes clean blocks through the first month.
The component list is how you see all three. Ask for the pump, valve and PLC brand and model, the plate thickness of the frame, the steel grade and heat treatment of the mould, and the test pressure before packing. Put that list beside the quotation. A supplier who will not write it has answered.
What has to be added to the FOB number?
FOB stops at the port and your plant is inland, so landed cost carries more lines than the quotation shows. Ocean freight and marine insurance follow volume and destination. Terminal handling and the clearing agent come next. Inland transport is priced by truck and by road, and machine height and axle load decide what can move it.
Then the site work. The foundation is reinforced concrete sized to the press footprint and to the soil, poured and cured before the machine arrives, because a slab poured too thin cracks under the ram. Commissioning, the power connection, the water line, compressed air, crane hire for unloading and the training days all sit in the same column.
This is how the cheapest quote becomes the most expensive plant. A low FOB with a light frame, a copied valve and a soft mould saves money once and charges you every month through stops, re-cuts and rejected blocks. Compare landed cost per saleable block, never price per machine.
Which six inputs do we need to price a QS1500 accurately?
Six inputs turn a range into a figure, and five of them come from your side of the table. Product and block drawing first, because the profile sets the cavity layout. Cavity count second, because it sets platen size, pressing force and cycle. Pallet size third, if you run trays at all. Target output fourth, in pieces of the product you actually sell.
Site supply details fifth: the power you can deliver, the water, the compressed air, available floor area and the soil report. Destination sixth: the port, the inland address and the access road, because a press that cannot reach the site has not been delivered. Put those six on one page and the machine is configured without a guess.
Frequently asked questions
How is a QS1500 hydraulic brick press price put together?
In five blocks, largest first: the frame and platens, the hydraulic package at 31.5 MPa, the mould set, the control and safety package, then export with freight. Frame and hydraulics are most of the machine. The mould is quoted separately because it follows your block profile and cavity count, and freight follows destination and packing.
Why does a double-direction QS1500 cost more than a single-direction one?
It carries a second pressing ram and the valve group that drives it, and it runs an 18 to 22 second cycle against 20 to 25 seconds. The second ram presses from both ends at once, which flattens the density gradient through the block height and sharpens the edges. You pay for that ram and for the strokes it buys.
Does pallet-free operation lower the total cost of a QS1500 plant?
It lowers the plant, not the press line. A pallet-free press deletes the pallet fleet, the return system and the repair bench, which is real money over a year of running. It also puts the grouping and lifting duty on the take-off side, where wet blocks have to be handled without a board under them. Compare the whole plant, not the machine.
What should I ask for before comparing two QS1500 quotations?
A component list: pump, valves and PLC by brand and model, frame plate thickness, mould steel grade and heat treatment, and the test pressure before shipment. Add the cavity count and cycle time for your own block, not a catalogue block. Two quotations without that list cannot be compared, and the lower total is usually the one missing a line.
How many mould sets does a factory selling three products need?
Three working sets, one per product, plus a spare of the fastest wearing product. A mould change without a spare on the shelf costs a shift, so the spare repays itself the first time a set goes out for re-cutting. Keep the signed drawings with the machine file, because a re-cut without the original drawing is slower and less accurate.