Output sizing

QSGW Production Line Output Per Hour: 3,750 to 31,250

15 November 2026 · 7 min read

Quick answer

QSGW production line output per hour is the shift rating divided by the hours in the shift, then trimmed to the slowest stage on the line. The line is configured from 30,000 to 250,000 pieces per 8-hour shift depending on host machine, so the ceiling runs from 3,750 to 31,250 pieces an hour. Real output sits lower, because the cuber, the curing racks and the minutes lost to mould changes set what the plant actually books.

Get a price on WhatsApp Or send a written enquiry

QSGW production line output per hour comes from the moulding host bolted to it. The line is configured from 30,000 to 250,000 pieces per 8-hour shift depending on host machine. Divide by eight: 30,000 over 8 hours is 3,750 pieces an hour, and 250,000 over 8 hours is 31,250 pieces an hour. Both ends are ceilings, not promises, because they assume eight full hours at the rated cycle with nothing stopped, which no plant delivers.

A buyer who asks for output per hour and receives a shift figure is not being dodged. These lines are sized in shifts because labour, power, curing time and the pallet fleet are all shift quantities.

The shift figure and the hourly figure are not the same number

Factories quote in shifts because a block plant pays for shifts. A figure of 90,000 standard bricks over 8 hours is a daily target for a QST8-15 host. Divided at face value it gives 11,250 bricks an hour, but that division spreads output evenly across every minute, including the minutes spent changing a mould or waiting for a truck of sand. Hourly output is what the line holds at its best minute; shift output is what it holds all day.

Three deductions stand between those two numbers, and each one is measurable on your own site.

  • Cycle and mould. The press works in pallets, not in pieces. Pieces per pallet are fixed by the mould drawing, and hourly output is 3,600 divided by the cycle in seconds, multiplied by the pieces on one pallet. The quoted shift figure already carries the manufacturer's cycle and mould assumption, so multiplying it again by a faster cycle invents output.
  • The downstream units. A cuber at 34.15 kW on a 15 to 18 second layer cycle, or a 44 to 45 kW unit at 12 to 15 seconds, clears about 3,800 pallets in a shift. If the press hands pallets over faster, the hour belongs to the cuber.
  • Time inside the shift. Mould changes, first-shot trials, cleaning and waiting on concrete eat minutes the rated cycle never sees.

Why does one line show 3,750 and another 31,250 per hour?

The span comes from the host machines, not from an options list. Three moulding hosts fill it with different pallet sizes, different clamping force and different installed power. A QST8-15 presses on a 980 x 860 x 22 mm pallet with 95 kN of vibration force, 31.5 MPa of rated pressure and 44.9 kW installed. A QST1800 presses on a 1,400 x 1,400 x 30 mm pallet with 280 kN and 104 kW. A larger pallet carries more pieces per stroke.

The bottom and the top of the range are two different factories, not two prices for one factory. When a quotation shows 250,000, ask which host draws it, on which pallet, at which cycle.

Moulding hostPallet, mmCycleQuoted output per 8 hours
QST8-15980 x 860 x 2215 to 23 secondsup to 90,000 standard bricks
QST12001,350 x 880 x 2515 to 25 secondsup to 120,960 standard bricks
QST18001,400 x 1,400 x 3015 to 25 secondsup to 220,000 standard bricks

Which unit sets the ceiling, the press or the cuber?

In most layouts the cuber does, because the press is allowed to wait and the cuber is not. The press hands green pallets to a lift; the cuber takes them a layer at a time, builds a square stack of 1,000 to 1,200 mm, up to 1,400 mm high, and discharges it. Its timer runs per layer, so the pallets it clears in an hour follow from that timer. The QS-1200A clears a layer every 15 to 18 seconds and is quoted at about 3,800 pallets a shift; the QS-1000G-C clears one every 12 to 15 seconds, cubes left and right, and is quoted at the same order of pallets per shift.

Curing is the second ceiling and the one buyers forget. Every green layer rests on its own pallet, so the pallets inside the kiln are a hard limit on what the press may make. A press that fills every rack before mid-shift waits or stops.

Floor area belongs in the same sum. A QS-1200A cuber covers 12,000 x 3,000 mm and weighs about 18,000 kg, and the rack field must sit within reach of the transfer car. Measure pallets per hour at every stage, take the smallest, then multiply by the pieces in your mould.

Worked example: 240 cycles an hour, and the figure the mould keeps

Take a QST8-15 at its fastest setting. The cycle range is 15 to 23 seconds, so at 15 seconds the machine finishes 3,600 divided by 15, which is 240 forming cycles in one hour.

The pieces per cycle are not in that sum and cannot be lifted from the pallet. A 980 x 860 mm pallet does not say how many blocks stand on it: the mould drawing does, and the answer moves with block height, wall thickness and whether the product is a hollow block, a paver or a kerb stone. Dividing pallet area by block face area ignores mould walls, feed box clearance and the edge strip, and it errs in the direction that flatters the line.

That is why the manufacturer publishes a range and a ceiling instead of one rate per product. Reverse the arithmetic to see how 90,000 was built: 90,000 over 8 hours is 11,250 an hour, and 11,250 over 240 cycles implies about 47 pieces per pallet on the product that figure was calculated for. Whether your mould yields 47 is a separate question, answered only by your own drawing.

Five ways buyers overstate line output

  • Reading the shift rating as an hourly rate. 90,000 over 8 hours is 11,250 an hour only if no minute is lost, and minutes are always lost.
  • Treating the host machine rating as the line rating. A press credited with 220,000 bricks still needs a cuber, a rack field and pallets to move what it claims.
  • Building the finance on the top of the range. The 31,250 an hour figure belongs to a QST1800 with a 104 kW installed load, a 34 t frame and a 1,400 x 1,400 mm pallet.
  • Forgetting the pallet fleet and the racks. Layer curing needs one pallet per green layer, so a short pallet count caps the press silently.
  • Assuming the span is an option pack. 30,000 to 250,000 is a change of host machine, and with it a change of pallet size, foundation, power and curing volume.

What should you send with a line enquiry?

A line is drawn backwards from the product and the shift target, so the equipment list comes last.

  • Target pieces per shift and the product mix you expect, because a paver line and a hollow block line on the same host do not deliver the same count.
  • Block dimensions and the first mould you intend to run, since the pieces per pallet live in that drawing and nowhere else.
  • Site area and the height you are allowed to build to, since the rack field and a 12,000 x 3,000 mm cuber footprint decide how much of the range your land can carry.

With those three and a shift target, the line can be drawn around them: the host, the cuber, the racks, the pallet fleet, and the three to six operators a shift needs. Without them, any figure quoted is the capacity of one machine standing on its own.

Frequently asked questions

How is hourly output worked out from a QSGW shift rating?

Divide the shift rating by eight. The line is configured from 30,000 to 250,000 pieces per 8-hour shift depending on host machine, so the ceiling is 3,750 pieces an hour at the bottom and 31,250 at the top. Then subtract the losses: the cuber cycle, the rack capacity and the minutes spent changing moulds decide how much of that ceiling a plant really books.

Which host machine reaches 31,250 pieces an hour?

The top of the range needs a QST1800 class host, with a 1,400 x 1,400 x 30 mm pallet, 280 kN of vibration force, 104 kW installed and a 34 t frame. The same mould on a QST8-15 will not reach it, because that pallet is 980 x 860 mm and the installed power is 44.9 kW. The host, not the curing layout, sets which end of the range a quotation sits at.

Does the cuber or the press decide the hourly figure?

Usually the cuber. A QS-1200A clears a layer every 15 to 18 seconds and is quoted at about 3,800 pallets per shift, and pallets arrive faster than that when the press runs a 15 second cycle with a wide mould. Once the cuber or the rack field is full, the press waits, and waiting time is not output. Size the cuber and the racks first, then the host.

How many blocks fit on one pallet?

That figure comes from the mould drawing, not from the pallet dimensions. A 980 x 860 mm pallet carries a different count for a 390 mm hollow block than for a 200 mm paver, and the count also changes with block height and wall thickness. A supplier quoting pieces per pallet without asking for your product and your mould is quoting a number that will not survive the first shift.

Is 250,000 pieces per shift a realistic target?

It is the ceiling of the line with the largest host installed, and it assumes eight hours at the rated cycle. A plant that changes moulds daily, runs a dense paver mix, or has a short rack field will land below it. Plan with the host that covers your normal product, then check that the cuber, the racks and the pallet fleet can clear what it makes.

Price guides
Machines that fit this

Want an engineering opinion on your project?

Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.

Talk to an engineer