QSMT1000 Wet Block Cuber Throughput per Shift
17 November 2026 · 6 min read
Quick answer
QSMT1000 wet block cuber throughput is 135,000 bricks of 240 × 115 × 50 mm in an 8-hour shift, which is 16,875 bricks an hour. A 13 to 18 second moulding cycle allows 200 to 277 cycles in that hour, and the bricks in each cycle come from the mould drawing, not from arithmetic. Output is capped by three things: bricks per cycle, cycle time, and how fast the cross-cubing head and the transport out keep pace.
QSMT1000 wet block cuber throughput reaches 135,000 bricks of 240 × 115 × 50 mm in an 8-hour shift, because the machine never waits for a pallet. Green blocks leave the mould, cross over on the cubing head and build a stack 1,100 mm high, ten layers of standard brick, while the moulding cycle of 13 to 18 seconds keeps running. That is 16,875 bricks an hour.
The figure is not a sales ceiling. It is the product of a cycle, a mould and a downstream pace, and any one of the three can pull a real shift below it. A buyer who knows which of the three is binding can write a shift plan that holds, and can argue with a supplier who quotes only the headline number.
135,000 bricks a shift, read hour by hour
135,000 divided by 8 is 16,875 bricks an hour. That is the only division the machine data supports, and it is enough to compare a shift target with a curing yard and a truck fleet. It is not enough to design a mould, and it says nothing about how many bricks sit in the mould at once.
The arithmetic also runs the other way, into the cycle. A 13 to 18 second moulding cycle gives 200 cycles an hour at the slow end and 277 at the fast end, since an hour holds 3,600 seconds. Between those two ends, the bricks in each cycle decide whether 16,875 an hour is reachable, and that count is printed on the mould drawing. It cannot be recovered from the shift figure, because the shift figure already assumes a mould.
| Parameter | QSMT500 | QSMT1000 |
|---|---|---|
| Moulding area | 1,150 × 560 mm | 1,150 × 1,100 mm |
| Exciting force | 68 kN | 150 kN |
| Total power | 39.5 kW | 57.5 kW |
| Total weight | ≈ 8,000 kg | ≈ 12,000 kg |
| Moulding cycle | 13 to 18 s | 13 to 18 s |
Where the pallet leaves the shift
On a pallet line every cycle produces a pallet load, and the pallet then travels: to the stacker, to the curing yard, back to the machine. The pallet is a container that has to be bought, repaired, cleaned and driven, and its return trip is a movement inside the plant that produces no brick.
The QSMT series removes that container. Wet blocks are cross-cubed online, so the 13 to 18 second cycle feeds a cubing head that builds a 1,100 mm stack directly, and the stack goes to curing as a block of bricks rather than as a pallet load. Pallet purchase and return haulage are the two lines that leave the plant with it.
What does not leave is the concrete. 135,000 bricks of 240 × 115 × 50 mm still have to be mixed, moulded and moved, whatever carries them. The 57.5 kW total power on the QSMT1000 covers the moulding side and the cubing side in one figure, and that is the figure an incoming electrical supply has to be sized against.
How many moulding cycles fit in an hour at 13 to 18 seconds?
Between 200 and 277. The lower figure comes from the 18 second end, the upper from the 13 second end, and the spread is the value of a fast mould and a mix that releases cleanly. On a 16,875 brick hour that spread is not small: it separates a line that meets its shift target with margin from one that needs a second shift.
Cycle time is also where a supplier claim gets tested. A machine quoted at 13 seconds on a dry, well graded mix will not hold 13 seconds on a wet mix that sticks to the mould, and the shift number moves with it. Ask for the cycle on the product the plant actually sells, and ask what the mix was when the figure was taken.
The two settings behind that cycle are visible in the data: 150 kN of exciting force at a rated pressure of 21 MPa, with vibration between 3,200 and 4,600 times per minute. A 13 second cycle on a 1,150 × 1,100 mm moulding area is what those numbers buy together, and none of them works alone.
What sets the bricks in one cycle, the mould or the cycle time?
The mould. Cycle time sets how often the mould fills, and the mould sets how much it fills with. A 1,150 × 1,100 mm moulding area is a frame, and what sits inside the frame is a drawing: block shape, wall thickness, cavity layout. Two moulds built for the same frame can carry different counts, and the shift figure follows the count.
That is why a shift figure is not a machine rating. The 135,000 bricks are stated for 240 × 115 × 50 mm, the standard brick, and the same machine on another product runs to a different figure that has to come from that product's mould drawing and its own cycle. Scaling 135,000 by area is the mistake that produces a number no mould can deliver.
Which cost lines does the missing pallet remove?
Two. A pallet fleet is bought by the thousand and replaced as it wears, and every pallet makes a return trip from the curing yard to the machine that has to be driven, loaded and unloaded. On a pallet-free line both lines are gone, and the ground the pallet yard needed is free for curing or for stock.
What remains is the press, the mixer, the cubing head and the transport out. Total power is 57.5 kW on the QSMT1000 against 39.5 kW on the QSMT500, and that single number replaces the machine figure and the stacker figure that a pallet line quotes separately.
The limit is layout, not price. A pallet-free line cubes wet, so the curing yard receives stacks and every vehicle route has to suit a 1,100 mm stack rather than a pallet. A plant that already owns a pallet yard has an asset and a habit to change, and that decision sits in the yard before it sits in the machine.
Three figures settle a throughput argument before a quotation is written: 135,000 bricks a shift, 200 to 277 cycles an hour, and the bricks per cycle from the mould drawing. The first two come from the machine, the third from the product. A plant that asks for all three, and for the cycle on its own mix, can size a curing yard and a truck fleet against numbers it can defend.
Frequently asked questions
How many bricks does a QSMT1000 make in an 8-hour shift?
Up to 135,000 bricks of 240 × 115 × 50 mm, which is 16,875 bricks an hour. That figure assumes a mould for that product and a 13 to 18 second cycle, so 200 to 277 cycles run in the hour. The bricks in each cycle come from the mould drawing, and no arithmetic on the shift total can recover that count.
What moulding cycle and force does the QSMT1000 use?
The QSMT1000 moulds on a cycle of 13 to 18 seconds, with 150 kN of exciting force at a rated pressure of 21 MPa and vibration from 3,200 to 4,600 times per minute over a 1,150 × 1,100 mm moulding area. Total power is 57.5 kW and total weight is about 12,000 kg, so the press and the cubing head share one supply.
Does the pallet-free design remove the pallet cost entirely?
It removes two lines: buying the pallet fleet and driving it back from the curing yard after every trip. It does not remove concrete, labour, curing or transport out. Those remain and are counted the same way on any line. What changes is that the plant no longer owns a container that has to be bought, repaired, cleaned and moved without producing a single brick.
Which model fits a smaller yard, the QSMT500 or the QSMT1000?
The QSMT500, on the numbers: a 1,150 × 560 mm moulding area against 1,150 × 1,100 mm, 39.5 kW against 57.5 kW, 68 kN against 150 kN, and about 8,000 kg against 12,000 kg. Its cycle is the same 13 to 18 seconds. The 135,000 brick shift figure belongs to the QSMT1000, so the QSMT500 output has to be quoted for its own mould.
What limits throughput more, the mould or the downstream line?
Whichever runs out first, and it is usually the downstream side. The press can hold a 13 second cycle, but a stack 1,100 mm high, ten layers of standard brick, has to be cleared before the next one is built. If the yard cannot take stacks at that pace, or the transport out runs behind, the press idles and the shift misses 16,875.
Want an engineering opinion on your project?