An automatic block handling system is sized from pallet cycles, not from the pallets standing in the yard. Divide 28,800 seconds by the host cycle and you have the pallets one shift must feed, cube and load. A 15 second cycle needs 1,920 pallets, which a 1,700 pallet cuber cannot clear; an 18 second cycle needs 1,600, which it can. Feeder, cuber and clamp come first, packing last.
An automatic block handling system is the part of a block plant that moves one pallet from the empty stack to the loaded truck: pallet feeding, wet and dry transfer, cubing, and loading. The forming machine sets the ceiling on output, but the handling chain sets what you ship, because every pallet passes the four links in order and waits at the slowest of them.
Most plants that want more output buy the wrong link first. They upgrade the host, or add a wrapper, while the feeder still holds three stacks and a man still walks pallets from the cuber to the truck. Treat the chain as one system, priced link by link, and sized from pallet cycles rather than pallet counts.
What are the four links in a block handling chain?
Four links, in this order, and every plant runs all four whether it paid or not. A link slower than the host makes the whole line that link's shift.
- Empty pallet supply. The QS-1200 feeder lifts neatly stacked empty pallets into a bin that holds three stacks and releases one every 13 seconds on 3 kW. Against a 15 second host cycle that leaves two seconds of margin per pallet, and the bin covers the reload.
- Transfer and curing. The finger-car line carries loaded pallets into curing and out again, single layer or multi layer, on a rail supply of 36 V DC stepped down from the mains, or on a 36 V lithium battery with an automatic charging pile. Three to four persons complete the whole production task.
- Cubing. The QS-1200A builds a stack in 15 to 18 seconds per layer, in 1,000 to 1,200 mm squares up to 1,400 mm high, on 34.15 kW, at about 3,800 pallets per shift. The fixed QS-1000G-A is rated at about 1,700 pallets per shift on 15 kW and clamps down to a minimum brick thickness of 50 mm.
- Loading out. A forklift clamp grips a 1,000 x 1,000 x 1,000 mm stack at 2,000 kg, which is 500 to 800 standard bricks or 40 hollow bricks per lift, and sets it on the truck bed with no pallet underneath.
How do you work out pallets per shift before choosing a link?
The usual estimate runs backwards. A buyer counts the pallets in his yard and calls that the shift. That figure describes the yard, not the line, and it hides the fact that the cuber is charged once per pallet that arrives, not once per block sold.
The forward calculation starts at the host cycle. An eight hour shift holds 28,800 seconds. Divide that by the cycle time and you have the pallet count, because each forming cycle drops exactly one loaded pallet on the cuber infeed.
On a QST1200 host running 15 to 25 seconds, one shift is 1,152 pallets at 25 seconds, 1,600 at 18 seconds and 1,920 at 15 seconds. Its pallet is 1,350 x 880 x 25 mm, and the chain is sized on the fast end of that range.
Now set those three figures against the cuber ratings. The 3,800 pallet rating of the QS-1200A covers all three. The 1,700 pallet rating of the QS-1000G-A covers 1,152 with room and 1,600 with 100 pallets to spare, but falls 220 pallets short of 1,920. A plant that buys the fixed cuber for a host it intends to speed up has bought its own bottleneck.
| 25 seconds | 1,152 | Covers it | Covers it |
| 18 seconds | 1,600 | Covers it, 100 spare | Covers it |
| 15 seconds | 1,920 | Short by 220 | Covers it |
Which cuber capacity fits a 1,350 x 880 mm pallet line?
Pallet size decides which cuber can be installed before capacity is even discussed. The QS-1200A builds 1,000 to 1,200 mm squares up to 1,400 mm high and stands on a 12,000 x 3,000 mm footprint at about 18,000 kg, so it wants its own slab and its own lane.
The QS-1000G-A sits inside the workshop on 7,500 x 7,000 x 5,500 mm at about 6,200 kg, with a chuck stroke of 1,500 mm and a clamping weight of 500 kg. Its minimum clamped thickness of 50 mm is the line that separates thin pavers from wall blocks: under it the clamp closes on air.
Why is one line quoted in three parts and another in five?
Handling equipment is never quoted as one number, because it is not one machine. Each segment carries its own specification, and each specification drags its own cost driver.
How many segments you get depends on what the plant already owns. A plant with a curing yard and two forklifts gets three: feeder, cuber, clamp. A new site gets five, because transfer, curing and packing are new steel. A three part and a five part quote on the same line usually differ in scope, not in margin, so ask for the segment list.
- Pallet feeder: bin capacity and cycle time. Three stacks and 13 seconds on the QS-1200, against the pallets one host cycle consumes.
- Transfer and curing: number of curing layers, number of sub-cars, and the power option, either rail 36 V DC or a 36 V lithium battery with a charging pile.
- Cuber: stack size and pallets per shift. The step from 1,700 to 3,800 pallets is a change of machine class, not an option box on the same frame.
- Forklift clamp: load and stack size, at 2,000 kg on a 1,000 x 1,000 x 1,000 mm stack with arms opening 680 to 1,150 mm.
- Packing: film type and packs per hour, quoted last because it sits last in the flow and its output depends on the pack the cuber delivers.
What order should the handling links be added in?
Order matters more than supplier, because every link you add changes the load on the next. Buy the wrapper first and you have added a machine behind the bottleneck: it runs at part load, its film cost per pack looks wrong, and the pallets still arrive by hand. The sequence is set by how many people each link takes off the floor.
- First, feeder and cuber in the same order. The feeder deletes the pallet carrying job, the cuber deletes the manual stacking gang, and one operator runs the cuber from a PLC and touch screen.
- Second, a curing line sized in the thousands of pallets, single layer or multi layer, so the yard stops being the queue and three to four persons can run the transfer.
- Third, packing. Wrapping only pays once the packs arriving at it are already square, counted and stable.
Which estimation mistakes cost the most?
Two mistakes repeat on almost every retrofit, and both come from counting the wrong object.
- Counting pallets instead of pallet cycles. A yard holding 2,000 pallets looks like it justifies a 1,700 pallet cuber, but the cuber is charged once per pallet that arrives each shift, and a 15 second host sends 1,920.
- Leaving manual handling off the sheet. Carrying pallets by hand costs injury time, a higher breakage rate on the bottom layer, and a crew that cannot be replaced on a holiday, and none of that appears in a machine quote.
- Reading the cuber cycle as if it were per pallet. At 15 to 18 seconds per layer on the QS-1200A, a 1,400 mm stack of 12 layers takes 180 to 216 seconds, so the number to plan with is per stack.
Frequently asked questions
What is an automatic block handling system?
It is the chain between the forming machine and the truck. It covers empty pallet supply, transfer into and out of curing, cubing, and loading with a clamp. Each link has its own cycle time and power rating, and the slowest one sets the shift output. A cuber rated at 1,700 pallets and a feeder on a 13 second cycle are two links of the same chain.
How many pallets does a 15 second host cycle need per shift?
An eight hour shift holds 28,800 seconds, so a 15 second forming cycle returns 1,920 loaded pallets. That is the figure the feeder, the transfer cars and the cuber must all clear. A cuber rated at 1,700 pallets falls 220 short, while one rated at 3,800 covers the shift with room for changeovers and short stoppages.
Which cuber fits a line that makes 1,600 pallets a shift?
Both the fixed and the low position cuber reach that figure, and the choice turns on stack size and floor area. A 1,700 pallet fixed cuber clears 1,600 with 100 pallets spare on a 7,500 x 7,000 mm frame. A 3,800 pallet low position cuber leaves a wider margin and builds 1,200 mm squares up to 1,400 mm high.
Why is a handling chain quoted in three parts and another in five?
The scope differs, not the margin. A plant with a curing yard and forklifts already in service buys a feeder, a cuber and a clamp, which is three segments. A new site also needs transfer cars, a curing structure and a packing line, which is five. Ask for the segment list before comparing any totals.
Should a packaging machine be added before a cuber?
No. Packing sits last in the flow, so it can only wrap packs the cuber has already built square. Installed ahead of the cuber it runs at part load, its film cost per pack gets worse, and the pallets still reach it by hand. Feeder and cuber come first because they take the most people off the floor each shift, then curing, then packing.