QS-1000G-A Fixed Brick Cuber: 1,700 Pallets a Shift
7 November 2026 · 6 min read
Quick answer
The QS-1000G-A fixed brick cuber clamps 500 kg of dry bricks per layer, lifts them 1,500 mm and stacks to 1,300 mm, at 16 to 18 seconds a layer and about 1,700 pallets a shift with one operator on 15 kW. It matches a QST6-15 press working 15 to 23 seconds, and it falls behind a press held at the fast end of that window. Its price is frame steel, clamp and hydraulics, control, travel gear and foundation.
The QS-1000G-A fixed brick cuber is a stationary stacking machine for dry concrete products. It clamps a layer of bricks at 500 kg, lifts it 1,500 mm, travels left or right and builds a stack, and one operator runs it for about 1,700 pallets a shift. Its price is not one figure: it is frame steel, the clamp and its hydraulics, the PLC and touch screen, the travel gear and the foundation. A buyer who compares only the first of those is comparing a welding quote with a machine.
The reason to buy one is labour and uptime, not speed on paper. A cuber replaces the two or three men who stacked bricks by hand, and it removes the pause when the stacking station fills and the press has to wait. That second gain is the one buyers forget to price: a machine that cannot clear the press cycle loses seconds on every cycle it misses.
Where does the cuber sit between the press and the forklift?
Follow one pallet. The press fills it with green bricks, it goes to the curing yard, and the cured bricks come back as a dry product that has to become a stack a forklift can move. The cuber is that step: it separates the bricks from the pallet, arranges them, clamps a full layer, lifts, travels, sets the layer down, and sends the empty pallet back.
Dry product only, and the reason is mechanical. A green brick has no strength of its own; the pallet under it holds it together. Clamp a wet layer at 500 kg and the edges crush, the layer shears, and the stack settles under its own weight. So the cuber sits behind the curing yard, not behind the moulding station, and a wet line needs online stacking, where the machine that forms the block also stacks it.
What decides whether one cuber keeps up with the press?
Two numbers have to overlap. The QST6-15 forms a pallet every 15 to 23 seconds. The QS-1000G-A cubes a layer in 16 to 18 seconds. One pallet in and one layer out are the same unit of work on a single-press line, so the G-A sits inside the press window for most of a shift, and that overlap is why the pair is sold as one line.
Run the arithmetic instead of the brochure. At 20 seconds the press makes 180 pallets an hour, and a cuber at 17 seconds clears about 212, so the stacker waits on the press and never the other way round. Push the press to 16 seconds and it makes 225 an hour while the cuber at 18 seconds clears 200. The gap is 25 pallets an hour, and it arrives as green bricks standing on the floor, not as an alarm.
The QST8-15, the QST1200 and the QST1800 reach 15 seconds at the fast end of their windows and run pallets up to 1,400 mm, so their pallet flow passes what a 1,700 pallet shift assumes. That is where a wider cuber system takes the line.
| Model | Machine power | Cycle per layer | Pallets per shift | Body weight | Press it suits |
|---|---|---|---|---|---|
| QS-1000G-A | 15 kW | 16 to 18 s | about 1,700 | about 6,200 kg | QST6-15, one press on one line |
| QS-1000G-B | 29 kW | 15 to 18 s | about 2,000 | about 9,000 kg | QST8-15 or QST1200 |
| QS-1000G-C | 44 to 45 kW | 12 to 15 s | about 3,800 | about 12,000 kg | QST1800, or two presses feeding one station |
What does the QS-1000G-A hold, lift and stack?
The clamp decides what the machine can accept. It grips 500 kg of bricks in one layer, needs more than 50 mm of brick thickness to get a hold, and travels 1,500 mm vertically. Stack height stops at 1,300 mm, which suits a stack a standard forklift can take away. Thickness is the number to check first, because a paver below the clamp minimum cannot be gripped at all.
The frame measures 7,500 × 7,000 × 5,500 mm, weighs about 6,200 kg and draws 15 kW. Operation is automatic or manual, clamping works in two directions, and lift and left-right travel are separate motions with the main clamp running on its own. Manual mode earns its place at a product change: a new stack is proved by hand before the automatic sequence is trusted with it.
- Size and weight: 7,500 × 7,000 × 5,500 mm, about 6,200 kg on the foundation.
- Cycle and crew: 16 to 18 seconds a layer, one operator for the shift.
- Clamp: 500 kg per layer, brick thickness above 50 mm, 1,500 mm stroke.
- Stack and output: 1,300 mm maximum height, about 1,700 pallets a shift.
When is a fixed cuber the wrong choice?
Four conditions rule it out, and none is about budget. A plant that changes product every few days needs fast re-arrangement, and a fixed single-purpose layout turns that into a queue. A rented yard, a site that moves, or a building that cannot take a cast base rules it out as well.
A stack above 1,300 mm rules out the G-A, because the clamp will not reach it. A brick thinner than 50 mm rules it out too. A wet line rules out the whole fixed family: green bricks are stacked by the machine that formed them, which is what the QSMT series does, cross-cubing the block as it leaves the press.
- Frequent product changes: the arrangement is rebuilt each time and a fixed layout becomes the constraint.
- No permanent foundation: the frame is bolted and levelled on a base that stays with the site.
- Stack above 1,300 mm: clamp stroke and stack height are a hard limit, not a setting.
- Brick under 50 mm, or a wet line: the clamp cannot hold it, and a wet stack collapses.
What is the price of a fixed brick cuber built from?
Five parts, and only one is visible in a photograph. The frame is steel, and this machine carries about 6,200 kg of it, so steel weight is the number that moves a welding quote. The clamp and its hydraulics are the second, and they are where the 500 kg grip and the 1,500 mm stroke are paid for. The third is control: the PLC, the touch screen and the panel around them.
The fourth is the travel gear, the rails and the drive that move the clamp left and right, with the pallet handling that feeds the machine and returns the empty pallet. The fifth is the foundation and installation: concrete, anchor bolts and levelling are site work, and no factory price includes them.
List what sits outside the price too: sea packing, freight, the cable run from your transformer to the panel, and the commissioning visit. Ask for each as a numbered line. A single figure for a 15 kW machine that says nothing about the foundation is not cheaper, it is unfinished.
What should a buyer send before choosing G-A, G-B or G-C?
Four facts choose the model. The press model and its cycle window say whether one cuber can sit inside the rhythm. The product and the number of layers in a stack say what the clamp holds and how high it reaches. The stack height says whether 1,300 mm is enough, and the site plan says whether the 7,500 × 7,000 mm footprint fits.
Send those four and the choice becomes a comparison. Between the G-A, the G-B and the G-C the difference is envelope and throughput, not quality. A plant that buys the larger machine for a QST6-15 line pays for capacity it will not use, and a plant that buys the G-A behind two fast presses buys a stacker that has to be watched every shift.
Frequently asked questions
How much does a QS-1000G-A fixed brick cuber cost?
The price is built from five parts, and no single figure covers them. Frame steel is the first, about 6,200 kg of it. The clamp and hydraulics are the second, carrying the 500 kg grip and the 1,500 mm stroke. Control is the third, travel gear the fourth, and the foundation and installation the fifth. Ask for each as a numbered line, because the fifth is site work and never sits in a factory quote.
How many pallets per shift does the QS-1000G-A stack?
The rated figure is about 1,700 pallets a shift with one operator, at 16 to 18 seconds a layer. That rating assumes steady pallet supply and a dry product ready to clamp. If the press feeding it runs at the fast end of its window, the cuber becomes the limit, and the arithmetic is simple: at 18 seconds it clears about 200 layers an hour against 225 from a press at 16 seconds.
Why can a fixed cuber handle dry bricks only?
Because the clamp grips the bricks, not the pallet. A green brick has no strength of its own and is held together by the board under it. Clamping a wet layer at 500 kg crushes the edges, shears the layer and lets the stack settle. Dry bricks carry their own weight in a stack up to 1,300 mm. A wet line needs online cross-cubing, which the QSMT series does instead.
Which press models match the QS-1000G-A?
The QST6-15 is the direct match: it forms a pallet every 15 to 23 seconds against a 16 to 18 second layer time, so one cuber sits inside the press window for most of a shift. The QST8-15, QST1200 and QST1800 reach 15 seconds and run pallets up to 1,400 mm, which points to the G-B at 29 kW or the G-C at 44 to 45 kW, both rated higher per shift.
Does the cuber need a special foundation?
It needs a cast base it can be bolted and levelled on, because it is a fixed machine and the clamp travels at speed with 500 kg hanging from it. The frame covers 7,500 × 7,000 mm and weighs about 6,200 kg, so the slab has to carry that load and hold level across the footprint. Foundation drawings come with the order; the concrete is poured on site.
Want an engineering opinion on your project?
Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.