Batch Plant Weighing: Load Cells, Dosing and the Cement You Waste
20 November 2026 · 5 min read
Quick answer
Weighing on a block plant is a cement bill decision before it is a controls decision. Cement runs at 200 or 260 kg per cubic metre of mix and water to cement stays between 0.35 and 0.45, so a 5 percent error on the cement dose is 10 to 13 kg of binder in every cubic metre you batch. A PL series batcher weighs each fraction on three point load cells in a fast pass and then trims it in a slow pass, which is what makes the recipe repeatable on a day when the sand arrives damp. A volumetric feed with a hand valve cannot do that, and adding around 30 kg of cement per cubic metre to cover the scatter is the most expensive way to solve a weighing problem.
A block plant buys cement by the tonne and sells blocks by the piece, and the batcher sits between those two numbers. When it is accurate, the recipe written in the office is the recipe that reaches the mould. When it is not, the plant finds out at the cube test, or later in a complaint about a pallet that broke on the truck. Every figure below comes from the specifications published on this site: a cement dose of 200 or 260 kg per cubic metre, water to cement of 0.35 to 0.45, and the PL series batcher with three point load cells and fast plus slow dosing.
What does a load cell change in the cement bill?
Cement is the largest single cost in a block and the easiest line to overspend without noticing. At 200 kg per cubic metre the binder is a fifth of the mix by mass; at 260 it is a quarter. A batcher that weighs each fraction in kilograms against a stored recipe holds that number. A batcher that drops material by volume or by time does not, because damp sand changes density between morning and afternoon, and the same gate opening delivers a different mass at four in the afternoon than it did at seven.
One percent of a 200 kg dose is 2 kg per cubic metre, which sounds small until it runs every shift in a plant batching tens of cubic metres a day. Multiply the table below by your own daily volume and the annual cement line moves by a load or two, not a bag or two.
| Cement dose | 1 percent error | 3 percent error | 5 percent error |
|---|---|---|---|
| 200 kg per m3 | 2 kg | 6 kg | 10 kg |
| 230 kg per m3 | 2.3 kg | 6.9 kg | 11.5 kg |
| 260 kg per m3 | 2.6 kg | 7.8 kg | 13 kg |
Why does dosing run in two passes?
A weighing hopper does not stop the moment the setpoint appears on the display. Material is already falling from the bin gate to the belt and from the belt into the hopper, and the load cell reads that falling material late. The practical answer is two passes: a fast pass that brings the hopper most of the way, then a slow pass at a restricted gate opening that trims to the setpoint. The slow pass is what turns a batcher into a repeatable instrument, and it is the part a cheap scope leaves out, because a second gate position costs a cylinder and a timer.
The same logic explains the vibration device on the aggregate hopper. Damp sand and recycled fines bridge above the gate, so the fast pass delivers less than the timer expects and the slow pass hunts for a setpoint it cannot reach.
How many bins does your product list actually need?
The bin count follows the recipes you sell, not the space left on the frame. A twin shaft mixer in the QS-1200 series accepts up to 80 mm with gravel and 60 mm with crushed stone, so the top size that reaches the mixer is set by your crusher, not by the drawing. Each fraction needs its own bin, gate and weighing, because the batcher doses one fraction at a time onto the collecting belt. Two sands are the common case here, a coarse crushed sand and a fine natural sand, and a blend that changes with every delivery needs two hoppers rather than one hopper and a shovel.
- The products you actually sell, by name and size, because each one carries its own recipe.
- The maximum aggregate size your crusher delivers, 80 mm for gravel or 60 mm for crushed stone.
- The fractions you intend to store separately, including the two sands.
- The cubic metres per batch you want to mix, which sets the mixer and the hopper together.
- The moisture range of your sand in the wet season, not the dry month average.
Where does moisture enter the recipe?
Water to cement stays between 0.35 and 0.45, and that band assumes the water you weighed is the water in the mix. Damp sand brings its own: every 100 kg at 6 percent moisture carries about 6 kg of water that the meter never saw, so a batch dosed exactly to the recipe arrives wetter, weaker at 28 days and stickier in the mould.
The correction is a routine, not a device. Sample and dry at the start of the shift, set the water dose from the result, and repeat when the weather turns or a new load arrives. A shift that ran wet and then added cement to compensate paid twice: once for the water, and again for the binder that water weakened.
What does a volumetric feed cost later?
A volumetric feed with a hand valve looks like a saving on the equipment list, and at the point of purchase it is one. The cost moves into the mix. Plants cover the scatter by adding around 30 kg of cement per cubic metre, which against a 200 kg dose is 15 percent on the binder bill, in every cubic metre, every shift.
The second cost is strength. Every 1 percent of trapped air left in the mix removes about 5 percent of compressive strength, and a mix that arrives wet because the sand was not corrected traps more air when the press closes. A 31.5 MPa closing force compacts what is in the mould; it cannot take out the water that should not be there.
What should you test before you accept the batcher?
Accept the batcher with your own material, not the factory's. Run ten consecutive batches of a recipe you will actually sell, catch each one, and weigh the cement and every fraction back on a separate scale. A batcher can hit the average and still scatter enough to matter.
- Ten batches of one recipe, cement weighed back on an independent scale.
- The slow pass visible on the display, not only the final total.
- Damp sand loaded on purpose, to see whether the hopper bridges.
- A stored batch record, one line per batch, that the shift can print.
- The gate and belt that stop the flow, checked at the setpoint and not empty.
Which numbers do we need to size the batching group?
The batching group is sized by the mixer it feeds. The QS-1200 series runs from JS500 at 25.5 kW to JS1500 at 75 kW, with machine weights from 4,000 kg to 9,080 kg, and a mobile batching plant covers 25 to 75 cubic metres per hour at 65 kW to 100 kW. The mixer sets the batch size, the batch size sets the hopper, and the hopper sets the frame and the foundation.
Send the products and their recipes, the fractions you store, the maximum aggregate size, the wet season moisture range, the cubic metres per batch and the site voltage. From those six answers the group is configured against your mix instead of a catalogue page, and the quotation lists the load cells, the dosing passes and the bin count as separate lines you can check.
Frequently asked questions
Is a load cell batcher worth it for a small block plant?
It depends on the cement line, not on the output. A plant batching even 20 cubic metres a day spends 4 to 5 tonnes of cement a day at a 200 to 260 kg dose, so a 5 percent scatter is 200 to 260 kg of binder a day, a recurring cost that does not shrink with the plant.
Can I add weighing to a plant bought with a volumetric feeder?
In most layouts, yes, and the work is the hopper and its frame rather than the mixer. The space above the mixer has to take a weighing hopper and a collecting belt, and the frame has to carry that load without passing vibration into the weighing. Ask for the general arrangement drawing first, because the support points move.
How often should the batcher be calibrated?
Weigh a known mass on each load cell at the start of every month, and re-calibrate whenever the reading drifts or a cell is replaced. Between calibrations the ten batch acceptance test is what matters, because it tests the whole dosing path and not the sensor alone.
Does the batching machine price change with the number of bins?
Yes, and the difference is structural rather than cosmetic. Each fraction adds a bin, a gate, a feed belt and its own weighing, and it widens the frame that carries them. A plant quoted for two fractions and later run on four has to be rebuilt, not upgraded.