Buying guide

Curbstone making machine: moulds, cycle and output

25 October 2026 · 6 min read

Quick answer

A curbstone making machine is sized by three parts in order: press, mould, handling. The press must be hydraulic, at 31.5 MPa and an 18 to 22 second cycle, because a long profile needs density through the edge. The mould fixes how many kerbs leave each stroke, and the clamp fixes how fast they leave the yard.

Get a price on WhatsApp Or send a written enquiry

A curbstone making machine is not a block machine with a fresh mould bolted on. The product is long and slender, one face carries the visible edge of a road, and the mix must stand almost without slump before the mould opens. Those facts push the purchase toward a hydraulic press, a mould stiffened along its length, and a handling plan.

Tonnage is the first number buyers compare, and it answers half the question. It says what the cylinder can push, not whether the arris survives the ejection stroke. A press that squeezes a wet mix cracks a kerb as reliably as a press that starves a dry one. What separates them is pressure applied to a mix dry enough to hold shape.

Why is a kerb not a block with a different profile?

A kerb is judged on the arris, the line where the top face meets the side. In a wall that line is buried under the next course; in a kerb run it stands in daylight, and a chipped arris is visible from a passing car. Rejected kerbs are not discounted, they are scrapped.

Length changes the mechanics. A standard brick is 240 mm long and a hollow block 390 mm, so a cavity filling 1,440 mm carries walls several times longer than either, and the same pressure acts over the whole span. The mould must be stiff along its length, or the middle of a long kerb leaves thicker than its ends.

Which press family holds the edge, and at what cycle?

Two hydraulic families do this work. The double-direction machines, QS800 to QS1500, press from above and below together at 31.5 MPa working pressure and run an 18 to 22 second moulding cycle. The single-direction machines, QS600 to QS1500, hold the same 31.5 MPa and run 20 to 25 seconds. Both work pallet-free.

Moulding area sets the kerb length you can offer. The double-direction family reaches 1,440 by 850 mm; the single-direction family spans 850 by 700 mm up to 1,440 by 850 mm. Main cylinder bore runs from 500 to 720 mm, the figure that turns pressure into force on the cavity.

Which to buy depends on the product mix. Where kerbs are the main line, the double-direction stroke buys 2 to 4 seconds every cycle and a flatter density through the height. Where kerbs share the plant with pavers, the single-direction circuit does the job with fewer parts.

How is a kerb mould laid out across the moulding area?

Layout begins with division. Divide 1,440 by the kerb length, divide 850 by the base width, and the whole-number result is the cavity count once the ejector strip is taken out. A long-profile mould usually carries 2 to 6 pieces where a block mould carries dozens, and that low count is why cycle time matters more here.

The frame is where a long mould wins or fails. Side plates deflect at mid-span under 31.5 MPa, so the frame carries ribs across the span and a heavier base plate than a block mould. A mould that flexes produces kerbs with a belly in the middle, and no machine setting corrects that.

  • Cavity count: whole kerbs that fit 1,440 by 850 mm after the ejector strip is deducted.
  • Ribs across the span: what stops the middle of a long cavity flexing at 31.5 MPa.
  • Draft and ejector travel: what lets a kerb clear the cavity without dragging its arris.

What does a wet mix do to the face?

A kerb mix is dry. It carries just enough water to bind under pressure, and the floor test is a squeezed handful that holds its shape without weeping. A mix that flows will not stand in a 1,440 mm cavity, and pressure cannot repair a mix that is already too wet.

Wet material fails in three places. Water bleeds to the face and leaves it porous, so the arris crumbles on stripping. The blank shrinks more in curing and the length drifts out of tolerance. The press squeezes water out at 31.5 MPa, loading the mould without gaining density.

Dry mix plus high pressure is what holds an edge. Particles compact instead of flowing, they lock at the arris, and the ejection stroke slides the blank clear instead of tearing it. Water added to speed the cycle trades the edge for a few seconds, which is the wrong trade on a product sold by its edge.

How many kerbs leave the press in a shift?

Start with the cycle alone. An hour holds 3,600 seconds, so an 18 to 22 second cycle gives 163 to 200 strokes; the 20 to 25 second single-direction cycle gives 144 to 180. Those count strokes, not kerbs, and they assume a press that never stops.

Cycle time is where it costs you. A long deep cavity needs longer vibration and a slower strip than a block, so a kerb stroke is not a block stroke. Mould changes add stops of their own, so a plant alternating weekly loses more shift time than one running kerbs for a month.

Derate before you plan. Strip 60 minutes for mould cleaning, one mix change and two short stops, and the shift runs 7 hours: 180 times 7 times 4 gives 5,040 kerbs. The 720 kerbs between the clean figure and the real one are what an unattended mould costs. Every figure here is arithmetic from a cycle, not a machine rating.

Can one vibration press make kerbs as a second product?

Yes, and plants do it. The QST1200 and QST1000 cover pavers, kerbs, slope-protection bricks and interlocking blocks on one frame, and the QST1800 and QST1500 do the same at higher volume. QST1200 is quoted up to 120,960 standard bricks an 8 hour shift, QST1800 up to 220,000, and a mould change switches the machine.

Cycle time is where it costs you. A long deep cavity needs longer vibration and a slower strip than a block, so a kerb stroke is not a block stroke on the same machine. Mould changes add stops of their own, so a plant alternating products weekly loses more shift time than one running kerbs for a month.

The rule is blunt. A vibration press with a kerb mould is a sound second product; a hydraulic press is the right home when kerbs are the main line. On either route, ask for the cycle guaranteed against your own kerb drawing, because block figures do not transfer.

Why does kerb stacking need its own handling plan?

Pallet-free operation removes the board, not the handling. A forklift clamp grips the stack directly, at 500 to 800 standard bricks or 40 hollow blocks per bite, up to 10 layers of standard brick and 5 layers of hollow block. A kerb is heavier per piece and longer, so a bite carries fewer pieces.

Stack geometry is the real difference. A hollow block stack stands on many small bearing faces and interlocks; a kerb stack stands on its base with the ends overhanging. Rows go base down, bound at both ends, and lifted under the full length, or the stack bends on the forks.

Build the yard around the product. Kerbs want long narrow curing rows, a clamp opening wide enough for the stack, and a loading sequence that puts long pieces where the clamp reaches them without re-stacking. A block yard of square stacks will not absorb a kerb run.

Frequently asked questions

Which press makes the best kerbstone?

A double-direction hydraulic press at 31.5 MPa with an 18 to 22 second cycle, because it presses from above and below at once and holds density through a long profile. A single-direction press at 20 to 25 seconds also works and has fewer parts to maintain. Buy the double-direction machine when kerbs are your main product, not a side line.

How many kerbs fit in one mould?

Divide the moulding area by the kerb footprint. On a 1,440 by 850 mm area a long profile leaves room for 2 to 6 cavities once the ejector strip is deducted, against dozens for a small block. Your own drawing decides the exact count, and that count, not the cycle, usually separates two quotations.

Why do my kerbs crack along their length?

Almost always the mould or the mix, not the press. A side plate that flexes at mid-span bends the blank, an ejector that lifts the centre first breaks it, and a mix that is too wet bleeds water to the face so the arris crumbles on stripping. Check plate thickness and water content before touching the hydraulics.

Does a wetter mix give a smoother kerb face?

No, it gives a weaker face. Water bleeds to the mould wall under pressure and leaves a porous skin, so the arris crumbles and the face dusts under a tyre. A dry mix compacts and locks at the edge, which is the surface a buyer judges. Add water only until a squeezed handful holds its shape without weeping.

Can I run kerbs on a block machine I already own?

Yes, if the moulding area takes the profile. QST1200 and QST1800 cover kerbs, pavers and blocks on one frame, and a mould change switches the product. Expect a slower stroke on a deep long cavity plus extra stops for every change. Ask for the cycle guaranteed against your kerb drawing before you order the mould.

Price guides
Machines used in this process

Want an engineering opinion on your project?

Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.

Talk to an engineer

Related reading

Request a quotation

A machine list, a layout drawing and a price, usually within one working day.

We reply within 12 hours. Your information is never shared.

WhatsApp Us