QSDJ Belt Rack Curing Production Line: Retrofit
11 November 2026 · 6 min read
Quick answer
A QSDJ belt rack curing production line retrofits rack curing behind a press you already run, of any make or model. A pallet lifter sets every layer on its own rack level, a lithium battery transfer car moves the racks, and the racks absorb the gap between the press cycle and curing time. The press does not stop for a full yard. A quotation needs the host model and cycle, the yard plan, the power entry, the pallet size and the product mix.
The QSDJ belt rack curing production line is a retrofit package rather than a complete plant: modules that mount behind a press you already run, of any make and model, and move curing off the floor and onto racks. The press keeps its own cycle. Each formed layer is lifted off its pallet, set on its own rack level and carried away by a transfer car, so the next pallet is already forming while the previous layer is still gaining strength. No layer rests on another.
That is the commercial argument in one line. A new line quotation assumes a new press, a new foundation and a new building. A retrofit keeps the asset that already earns money and fixes the part that limits it, which in most plants is the yard rather than the machine. The enquiries that reach us usually come from a press forming a pallet every 15 to 23 seconds, with a curing floor that fills before the shift ends.
The retrofit sits between the press and the curing yard
The package is a fixed list: pallet lifter, lowering machine, heavy pallet conveyor, empty pallet conveyor, transport sub-car, shuttle mother car, smart charging pile, automatic control system and automatic cuber. Read it in three groups. The lifter and the lowering machine move bricks vertically. The two conveyors and the sub-car move them horizontally, one taking loaded pallets out to the racks and one returning empty boards. The cuber and the control system close the loop at the discharge end.
Installation order decides how long the press stands still. Rails and conveyors go in first, because they need floor work and a survey. The lifter and the lowering machine are set against the press frame. The cuber sits at the far end of the rack rows. A plant that installs the cuber first has nowhere to send cured bricks and goes back to stacking on the ground, which is the habit the retrofit was bought to end.
How does a rack level break the link between pressing and curing?
On a pallet line the pallet leaves the press and joins a queue standing on the ground. When the yard fills, that queue reaches back through the stacker and the press stops. The retrofit cuts the queue out. The lifter takes the full layer off its pallet, raises it to the first free rack level and hands it to the sub-car, and the rack leaves with the layer on it. The empty pallet goes back down the empty pallet conveyor to the forming station.
Two things follow from that. No layer carries another, so a hollow block with a thin face is not loaded by the weight above it, and the crush marks that form in the bottom courses of a ground stack never appear. And curing becomes stock rather than a stage in the route: the racks hold a known number of levels, and that number is the only buffer figure worth arguing about when the press cycle is compared with the yard.
Which site figures does the quotation need first?
Five figures, and an offer written without them is a guess on a letterhead. Start with the host machine: make, model and cycle window. A QST6-15 forming a pallet every 15 to 23 seconds and a QST1800 running 15 to 25 seconds on a 34 t frame do not take the same rack count or the same sub-car travel.
Then the yard: the footprint you can give to racks and aisles, drawn to scale, with the route the sub-car will follow. Then the electrical entry, meaning the supply you can bring to the new panel, read against the installed capacity of the host, which is 34.4 kW on a QST6-15 and 104 kW on a QST1800. Then pallet count and pallet size, because the pallet fixes the rack pocket: 980 × 680 × 20 mm and 1,400 × 1,400 × 30 mm are two different racks, not one rack on two settings. Then product mix, since a paver layer and a hollow block layer are not the same height.
| Figure you send | What it decides in the design |
|---|---|
| Host make, model, cycle window | How many rack levels and how much sub-car travel the line needs |
| Yard footprint drawn to scale | Rack rows, aisle width and where the cuber can stand |
| Power available at the new panel | Panel size and the charging point for the transfer car |
| Pallet count and pallet size | The rack pocket cut, which cannot be adjusted later |
| Product mix and layer height | Rack pitch and how many layers a rack row can take |
The lithium car and the RS-485 network remove two site problems
The transport sub-car runs on a new-energy lithium battery under wireless control and charges at a smart charging pile. Nothing trails behind it: no cable, no festoon, no conductor rail in the aisle. On a site where a forklift crosses the sub-car route several times a shift, a cable lying on the floor is both a maintenance item and a hazard, and a wireless route can be re-laid without re-wiring it.
The modules talk over a self-organised RS-485 wireless network with cloud remote monitoring and fault diagnosis. A fault reaches a screen before the operator has walked to the machine, and the diagnosis can be read from another country. That turns a service visit into a conversation, and it is the part of the retrofit a buyer notices in the second month rather than on the day of handover.
Charging is the one electrical decision made on the car itself. The pile belongs on the route, where the sub-car can dock on its own schedule, not at the end of a spur it has to reverse into.
What does the retrofit leave out?
The host press, its moulds and its pallet supply stay yours, because you already own them. The batching and mixing plant is not in the package either. Nor is the curing yard building, nor the civil work: the slab, the drainage falls and the rack bases are site work, priced by a local contractor against a drawing you will be given.
Three items sit outside the offer as well. The cable from your transformer to the new panel is yours, and its cost follows the distance and the supply you have. Sea packing and freight are separate. So is the commissioning visit. Ask for each as a numbered line, because a single figure that hides the slab and the cable is not a cheaper price, it is an incomplete one.
One expectation needs correcting before signature. The retrofit does not make curing faster. It removes the press blockage that curing causes, and the blocks still need their time on the rack. What changes is who waits.
Which mistakes show up in the first month?
A rack bought to the wrong pallet size is the first. The pocket is cut for one board, so a plant running 980 × 860 × 22 mm pallets on one press and 1,350 × 880 × 25 mm on another needs two pocket sizes or a rack that takes both. Racks ordered before the product mix is settled stand empty while pallets wait on the floor.
A floor that is not level is the second. Rails bolted to a slab with a fall across the aisle make the sub-car hunt for position at every stop, and the fault reads as a control problem until somebody puts a level on the concrete. Survey the slab before the rails are set out, not after.
The third is a charging pile placed where the sub-car cannot dock. Behind a rack row, or across a forklift route, the pile gets used only when the car is already low, and the line stops mid-shift. Put it on the route, dock the car on it before handover, and mark the position on the floor.
Frequently asked questions
Can a QSDJ retrofit attach to a press from another manufacturer?
Yes. The package is designed around the host machine rather than the other way round, and compatibility is stated as any manufacturer, any model. What changes from one press to another is the interface: the height the lifter meets the pallet, the cycle window the control system is timed against, and the pallet size that sets the rack pocket. Send the make, model and cycle and the design follows from those figures, not from a standard drawing.
What information do you need before quoting a rack curing line?
Five items. The host machine make, model and cycle window. A scaled yard plan showing the footprint you can give to racks and aisles. The power you can bring to the new panel, read against the installed capacity of the press, which is 34.4 kW on a QST6-15 and 104 kW on a QST1800. The pallet count and pallet size. The product mix and the layer height for each product. Floor level readings help as well.
Does the transfer car need a cable or a conductor rail?
No. The transport sub-car runs on a new-energy lithium battery with wireless control and charges at a smart charging pile, so nothing trails behind it and no conductor rail runs down the aisle. That matters where forklifts cross the route, because a live rail or a loose cable on the floor is a hazard in a yard that was not laid out for it. The pile position is the only charging decision.
Why must rack pockets be cut to the pallet size before ordering?
Because the pocket is welded and cut, not adjusted. A pallet of 980 × 680 × 20 mm and one of 1,400 × 1,400 × 30 mm need different openings, and a rack cut for the smaller board will not take the larger one at all. A plant with two pallet sizes across two presses ends up with two rack types or an idle rack row, and either outcome is paid for twice.
What does the retrofit not include?
The host press, its moulds and its pallets, because they are already yours. The batching and mixing plant is separate, and so is the curing yard building. Civil work such as the slab, drainage falls and rack bases is done by a local contractor against our drawing. The cable from your transformer to the new panel, sea packing, freight and the commissioning visit are outside a factory offer and should be priced as separate lines.