Market guide

Block Machine for Sale in Zimbabwe: Products and Moulds

5 November 2026 · 6 min read

Quick answer

One QST6-15 on a 980 x 680 x 20 mm pallet is the entry point: 12 t, 34.4 kW, a 15 to 23 s cycle, 68 kN of excitation force and 25 MPa of press. The mould set decides the product, so buy the first set for the one product you will sell every week and the two sizes that cover most orders. A second set on the same pallet reuses the frame and base plate.

Get a price on WhatsApp Or send a written enquiry

A block machine for sale in Zimbabwe is only as good as the mould set that ships with it. The QST6-15 is a 12 t vibration and press machine on a 980 x 680 x 20 mm pallet, with 34.4 kW installed, a 15 to 23 s cycle, 68 kN of excitation force and 25 MPa of hydraulic pressure. Change the mould set and the same frame produces hollow blocks, porous bricks, paving bricks, kerb stones or slope-protection blocks.

The real decision is not which machine to buy but which product mix the first mould set should serve. The frame, the table and the press stay; the product comes out of the mould. The buying order therefore runs from product to finished size, then to mould, then to cavity count, then to steel, and the machine model follows the pallet that mould needs.

What can one QST6-15 make by changing only the mould?

A mould set is one assembly: a mould frame that clamps to the machine, a core that forms the voids, a base plate that closes the bottom of the cavity, a guiding assembly and a positioning mechanism that hold alignment through every cycle. Nothing else on the machine changes. Keep the 980 x 680 x 20 mm pallet and the frame stays; change the core and the base plate and the product changes.

The QST6-15 datasheet lists four sizes, each tied to its own drawing. Kerbs and slope-protection blocks use the same frame with a different core.

  • Hollow blocks 390 x 190 x 190 mm: 6 per mould in the QST6-15 datasheet.
  • Porous bricks 240 x 115 x 90 mm: 15 per mould.
  • Standard bricks 240 x 115 x 51 mm: 32 to 36 per mould.
  • Coloured floor tiles 200 x 100 x 60 mm: 21 to 24 per mould.
  • Kerb stones and slope-protection blocks: the same frame, with a core and stripper built for the profile.

What does a mould change involve, step by step?

Six steps, in order. Release the clamps that hold the frame. Lift the set out on the workshop hoist. Clean the table and the pallet contact faces. Set the new frame and torque it down. Run empty cycles to confirm that the core enters and withdraws without contact. Press a first pallet and measure it. A core that sits out of line marks every block and every pallet until it is corrected.

Downtime is set by three things, and none of them is the bolt count: how the set is lifted, whether the table has to be reset for a different product height, and whether the first pallet goes to the yard or to a lab. A plant that changes product twice a week should settle the hoist and the mould rack before ordering the second set.

The second set usually costs less than the first, for a structural reason. On the same 980 x 680 mm pallet, the frame, base plate, guide pins and positioning blocks carry over, and only the core and the stripper are new. A set for a different pallet footprint is new from the frame up. That is why the first question about any second product is whether it fits the pallet already on the machine.

How do you choose the first mould set?

Three decisions, in this order. First the product the plant sells every week, plus the two sizes that cover most of the order book; a mould for a size nobody orders is a shelf ornament. Second the cavity count, which the mould drawing fixes and which 68 kN at 25 MPa then has to prove. Third the steel, the heat treatment and which parts can be replaced on their own.

  • Name the main product and the two most-ordered sizes first, and put them on one specification line.
  • Send the finished sizes in mm, with the void pattern and the face finish if the product is a paver.
  • Leave the cavity count to the drawing, and ask for it in the offer instead of calculating it yourself.
  • Ask for the steel grade, the hardening cycle, and whether the core can be changed without scrapping the frame.

Mould steel and heat treatment decide the long-run cost

A mould is a wear item, and it wears at the edges: the corner of every core, the rim of every cavity, the face of the stripper. Wear-resistant alloy steel, machined on CNC to micron level and put through a professional hardening cycle, holds those edges far longer than mild steel. The cost of a soft set never appears on the invoice. It appears as blocks drifting out of tolerance, as a reject pile that grows by the pallet, and as a second set ordered a year early.

Heat treatment is the item buyers cannot see and rarely ask about. An unhardened core peens over at the void corners under 68 kN of excitation and 25 MPa of press force, and once a corner rounds, every block carries the mark. A hardened core keeps the corner crisp, so the dimension stays inside tolerance. Ask for the hardening specification in writing, not for the word hardened.

Wear parts should also come apart. When a core can be replaced without scrapping the frame and the base plate, a worn set becomes a smaller purchase instead of a new one.

Which dimensions do you measure on the first block?

Five measurements, taken on the first pallet before the second one is pressed. Overall length, width and height against the drawing. Wall thickness at the thinnest point, which on a hollow block decides the load class. The gap between adjacent blocks on the pallet, which shows whether the core and the feed box are set right. Squareness of the face, checked on a flat plate. And height corner to corner across the pallet, where an unlevel table shows first.

Record the numbers, not the verdict. A first-pallet sheet with drawing values beside measured values tells you whether the mould is wrong or the mix is wet, and it is the sheet you compare against in month six when the core begins to wear.

What should go into an enquiry for a machine and a mould set?

Four lines. The products and finished sizes you intend to sell, in mm. The pallet size, if you already run one. The power available at the site, so the 34.4 kW installed capacity of a QST6-15 can be checked against it. And the destination, because the machine travels as a 9,450 x 3,300 x 2,700 mm frame at 12 t, and that envelope sets the shipping arrangement.

The one answer that decides the rest is your product list. Tell us the products and the sizes you intend to make, and the mould, the pallet and the machine model follow from it. A block making machine price quoted against those four lines can be compared with another supplier's. A price built on a model number alone cannot.

Frequently asked questions

Can one block machine really make hollow blocks and pavers?

Yes, when more than one mould set is bought with the machine. A QST6-15 runs a 980 x 680 x 20 mm pallet, and the product is decided by the frame, core and base plate clamped to it. Hollow blocks, porous bricks, standard bricks, coloured tiles, kerbs and slope-protection blocks all come off the same frame once the tooling changes. The pallet footprint is the limit, not the machine.

Why is a second mould set cheaper than the first?

Because most of the set carries over. If the second product runs on the same pallet footprint, the frame, base plate, guide pins and positioning blocks are reused and only the core and stripper are new. A product that needs a different pallet is a new set from the frame up, which is why the pallet decision should be made once, at the start.

How long does a mould change take?

No single figure covers it, because the work is set by the lift, the table reset and the first-piece check rather than by the bolts. Two plants with the same machine can differ by hours if one has an overhead hoist and a mould rack and the other lifts the set with a forklift and a sling. Plan the handling equipment with the second mould, not after it.

Which dimensions should I check on the first pallet?

Length, width and height against the drawing, wall thickness at the thinnest point, the gap between adjacent blocks, squareness of the face on a flat plate, and height corner to corner across the pallet. Write the measured values beside the drawing values and keep the sheet. It separates a mould fault from a mix fault, and it becomes the baseline for later wear.

Does a hardened mould matter on a small machine?

Yes. A QST6-15 presses at 25 MPa with 68 kN of excitation force, and those loads land on the core edges every 15 to 23 s. A soft core peens at the void corners, the block face picks up the mark, and the dimension drifts. Wear-resistant alloy steel with a professional hardening cycle holds the edge, so the set is replaced for wear, not for shape.

Price guides
Machines that fit this
Machines used in this process

Want an engineering opinion on your project?

Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.

Talk to an engineer

Related reading

Request a quotation

A machine list, a layout drawing and a price, usually within one working day.

We reply within 12 hours. Your information is never shared.

WhatsApp Us