A finger-car curing line is the transport layer of an automatic block plant: a mother car on a rail positions itself by encoder, sub cars lift a whole stack of pallets and set it into a curing position, and the line carries the stack into the curing chamber. It changes three things a buyer can price: labour, which falls to 3 to 4 people for the whole plant, building height, because multi-layer curing trades floor for levels, and pallet handling, since nothing touches a single block between the press and the cuber. The line does not form blocks and does not improve a mix; it only decides how fast and how cheaply the pallets move.

Get a price on WhatsApp Or send a written enquiry

Most plant enquiries start with the press and treat everything behind it as steel that comes with the order. Curing transport deserves the same attention as the press, because it is where a plant loses hours without noticing: a stack that waits for a car, a rack position that is empty because nobody counted it, a battery that goes flat mid-shift. A finger-car line answers those three, and it does so with a defined set of choices rather than one catalogue item.

The line sits between the press and the cuber, and everything it touches has to agree on two numbers: the pallet and the discharge height. Get them wrong and the plant owns a transport system that jams on the first shift.

What the line actually moves

The unit of transport is not a block, it is a stack of pallets with the green blocks still on them. The sub car lifts the whole stack into place and then carries it into the curing chamber, and the mother car uses an encoder to calculate travel distance and position, so one mother car can serve several sub cars. Each sub car carries its own onboard computer and positions every stack on every curing lane, which is the part that matters: a stack placed half a pallet off closes the lane behind it.

Because the line lifts stacks rather than pieces, it never touches a block face. That is its real advantage over a yard served by forklifts: no clamp marks, no chipped arrises from a stack set down hard, and no operator judgement about how high a stack can go. It also cannot fix a pallet that is out of flat, and it carries a bad one into the chamber as faithfully as a good one.

Single layer or multi layer: a building decision

The line runs single-layer curing as standard and takes a multi-layer upgrade when the building has height to spare. The trade is direct: single layer needs floor area equal to every pallet in circulation, while multi-layer stacks the same positions into levels and cuts the footprint. The second option adds a lifter, a chamber with a level structure, and a level pitch set to the pallet you run.

Pallet size drives the steel before it drives the count. A 1,400 x 1,400 mm pallet covers 1.96 square metres against 0.67 square metres for a 980 x 680 mm pallet, so the same 3,600 positions ask for nearly three times the floor and the steel when the plant runs the larger machine. Pallet plate thickness of 20 mm and 30 mm also do not share a level pitch, which is why a line built for one press model does not quietly accept another.

Track power or lithium battery

Both options exist for the same sub car, and the difference is where the work goes. Track power takes 380 V AC through a special transformer and feeds 36 V DC along the running rail, so the machine draws from the rail it travels on. The battery option uses a 36 V pack with a battery management system and an automatic charging pile. Neither is a cheaper machine; they are two different maintenance habits.

Pick on the building and on who is on the payroll, not on the quotation line.

  • Track power wants an uninterrupted rail, clean joints and drainage where the floor is washed, because water along an electrified rail is a fault that repeats.
  • Battery power wants a charging position written into the layout, and a habit of charging at the same point in the shift rather than when the car slows.
  • Both live in a dusty plant, so the cabinet seals, the rail covers and the sensor windows are the parts that decide uptime.
  • Ask which option the local maintenance team has already worked on. Familiarity beats a specification advantage in the second year.

Sizing the line against the press

The count that matters is positions, and it comes from one multiplication: the pallet rate of the press, which is 3,600 divided by the cycle in seconds, multiplied by the hours a block stands before it is cubed. A QST8-15 at 20 seconds gives 180 pallets an hour, and a 20 hour curing window asks for 3,600 positions. A QST1800 at 15 seconds gives 240 pallets an hour, and the same window asks for 4,800.

Size at the fast end of the published cycle, because a press cannot be told to wait for the transport system. The band runs 15 to 25 seconds on the larger models and 15 to 23 seconds on the smaller ones, and the fast end is what the line must absorb on a good day. The curing window, by contrast, belongs to the product and the climate, and it is the only input the plant can negotiate: cut four hours off a 20 hour window on that QST8-15 and the line sheds 720 positions of steel.

What the crew of three or four covers

The whole plant runs with 3 to 4 people, and that figure is a consequence of where the decisions went. The line runs on a PLC with a touch screen, so parameters are adjusted at the screen and every movement is visible. Laser sensing and intelligent sensors give unmanned transfer, and on a fault the line stops, alarms and displays the fault position, so a non-specialist clears it instead of waiting for an engineer. Remote access and cloud data let the builder read a fault from the office.

The crew that remains is what automation cannot replace, and a buyer should budget for it out loud rather than assume the number covers everything.

  • Mould changes, which stop the line and need hands at the press, not at the screen.
  • Quality sampling, because a line that reports its own faults does not test its own blocks.
  • Pallet inspection and repair, which the line carries faithfully and cannot correct.
  • Cleaning of rail, cabinet and sensor windows, and the yard work on the far side of the cuber.

Fitting the line to a press you already run

The line is built to connect to a block forming machine from any manufacturer and any model, and existing presses can be upgraded rather than replaced, with the layout drawn around your site. That is the sentence that sounds easiest and costs the most attention, because a retrofit is a measurement job. Five figures decide whether the drawing closes: pallet size and plate thickness, the cycle band in seconds, the discharge height at the press, the building column grid, and the floor level between press and chamber.

Send those five with the model of the press and the output you must book, plus the height you can build to and the power available at the site. With that set we confirm whether the line should be single layer or multi layer, how many sub cars the mother car has to serve, whether the track feed or the battery option fits the building, and the position count for your curing window. The confirmation comes attached to the quotation, so the two numbers are read together.

Frequently asked questions

Does a finger-car line replace the cuber?

No. The line moves stacks from the press to the curing position and back to the cuber. The cuber still does the stacking into cubes for handling and transport. What changes is the labour between the two: pallets no longer travel on a forklift through the yard, and nobody decides where a stack goes.

How many curing positions does the line need?

As many as the press fills during the curing window. Take 3,600 divided by the cycle in seconds to get pallets per hour, then multiply by the hours a block stands before cubing. A QST8-15 at 20 seconds makes 180 pallets an hour, so a 20 hour window needs 3,600 positions. Size at the fast end of the cycle band.

Can a single-layer line be upgraded to multi-layer later?

The standard configuration is single layer, and multi-layer curing is an option ordered with the line, because it changes the lifter, the chamber structure and the level pitch. Decide it with the building, not after the slab is poured: the height has to exist above the rail, and the level pitch follows the pallet thickness you run.

Track power or battery: which fails less often?

Neither is inherently more reliable; each fails in a different place. A track feed fails at joints, insulation and water on a washed floor. A battery fails through charge discipline and pack age. Both fail at the cabinet and the sensor windows if dust is not managed. Choose the one your maintenance team has already handled.

Price guides
Machines that fit this
Machines used in this process

Want an engineering opinion on your project?

Tell us what you want to produce and which raw materials you have, and we will recommend the right machine.

Talk to an engineer

Related reading

Request a quotation

A machine list, a layout drawing and a price, usually within one working day.

We reply within 12 hours. Your information is never shared.

WhatsApp Us